Page 117
Brute Elite Boilers and Water Heaters
Burner Ignition Sequence
Here is the start-up sequence following a Lead Lag
(LL) Central Heating request:
1. The thermostat used for the LL Central Heat
function calls for heat. On a system set up for
Lead/Lag operation, this will be the System
sensor. (The setpoint or modulation can
also be controlled by an external 4 – 20 mA
control.)
2. The Boiler pump and System pump are
energized. The water temperature in the
System loop drops until it reaches the LL
Central Heat Setpoint minus the LL Central
Heat On Hysteresis value.
3. The controller prepares to start the burner.
The controller does a system check, flap valve
check, and safety chain test. The blower fan is
switched on.
4. The air pressure switch is closed, and the
purge rate proving fan rpm is reached. The
Pre-Purge time starts.
5. When the Purge time is complete, the purge
fan rpm is changed to the Lightoff Rate.
6. When the fan rpm reaches the light-off rpm,
the Pre-Ignition time begins.
7. During the Pre-ignition time, the controller
energizes the igniter and checks for flame.
8. After Pre-ignition, the control enters the
ignition sequence and the gas valve is
energized. The flame signal is compared with
a preset flame threshold value. If the flame
signal is higher than the flame threshold, the
gas valve remains on and the burner is allowed
to continue to the Run phase. If the flame
signal is below the threshold, the controller
returns to the Pre-Purge phase and starts the
ignition process again.
9. The igniter is turned off at the end of the
ignition period.
10. During the Run period, the speed of the
burner fan and the firing rate of the burner(s)
is modulated in response to changes in
demand. (See the next section – “Modulation
Sequence.”)
11. The demand ends when System sensor
temperature equals the Lead/Lag Central Heat
Setpoint plus the Lead/Lag Central Heat Off
Hysteresis value (approx. +10°F).
12. At the end of the Lead/Lag Central Heat
request, the burner is switched off. The fan
stays on until Post Purge is complete.
13. Any new Lead/Lag Central Heat request is
blocked for the Anti Short Cycle time.
14. The Boiler pump and System pump remain on
during their pump overrun times.
15. At the end of the pump overrun times, the
Boiler and System pumps are turned off.
lead/lag modulation Sequence
For a detailed explanation, see Section 9.
Domestic Hot Water Priority
The start-up sequence for a Domestic Hot Water
request, on a system with Domestic Hot Water
priority, is essentially the same as the process we
have just described. The Domestic Hot Water loop
can be considered as just another heating loop on the
system, except the controller can be set to give this
loop priority. The input is supplied by an aquastat,
rather than a thermostat. Circulation in the Domestic
Hot Water loop is provided by a separate pump.
When a Domestic Hot Water demand appears at the
same time as a call for heat by Central Heating, the
priority feature forces the system to switch to the
Domestic Hot Water demand for the priority time.
The Domestic Hot Water priority demand forces the
controller to operate using the DHW setpoint.
For a detailed explanation, see the material on
Domestic Hot Water in Section 9.
Safety Shutdown functions
Each controller has extensive self-checking and
safety features. The controller will shut down the
burner and lock it out under any of the following
conditions:
During the Synchronization Period:
•
Locks out if the Lead/Lag Master cannot
locate any of the boilers, or cannot download
information from any of the controllers.
•
Locks out if the Lead/Lag Master cannot
locate any of the flap valves, or cannot
determine the status of a valve (Open or
Closed).
•
Locks out if a safety-related parameter has
been changed, but the change has not been
verified and the controller has not been reset
using the button on the front of the control.
Содержание BNTH1000
Страница 2: ...Bradford White Corp...
Страница 12: ...Page 8 Bradford White Corp Fig 6 Dimensions BNT 1700...
Страница 38: ...Page 34 Bradford White Corp Fig 21 Ladder Diagram...
Страница 39: ...Page 35 Brute Elite Boilers and Water Heaters Fig 22 Wiring Diagram...
Страница 40: ...Page 36 Bradford White Corp...
Страница 52: ...Page 48 Bradford White Corp Fig 51 Connection Terminals...
Страница 129: ...Page 125 Brute Elite Boilers and Water Heaters Fig 140 Machine Frame BNT1000 13 3 PARTS ILLUSTRATIONS...
Страница 130: ...Page 126 Bradford White Corp Fig 141 Rear Panel BNT1000 Fig 142 Rear Panel BNT1700...
Страница 131: ...Page 127 Brute Elite Boilers and Water Heaters Fig 143 Machine Frame BNT1700...
Страница 132: ...Page 128 Bradford White Corp Fig 144 Front Panels and Covers BNT1000 and BNT1700...
Страница 133: ...Page 129 Brute Elite Boilers and Water Heaters Fig 145 Burners and Combustion Chamber BNT1000...
Страница 134: ...Page 130 Bradford White Corp Fig 146 Burners and Combustion Chamber BNT1700...
Страница 136: ...Page 132 Bradford White Corp Fig 149 Burner Detail BNT1700...
Страница 137: ...Page 133 Brute Elite Boilers and Water Heaters Fig 150 Electronic Components Fig 151 Condensate Trap BNT1000...
Страница 138: ...Page 134 Bradford White Corp Fig 152 Condensate Trap BNT1700 Fig 153 Flow Switch BNT1000 and BNT1700...
Страница 139: ...Page 135 Brute Elite Boilers and Water Heaters This page intentionally left blank...
Страница 140: ...Page 136 Bradford White Corp This page intentionally left blank...