
OL-B300-16
› Hook the first flow profile in the first trolleys, the second flow profile into the second trolleys,...
› Unhook the first flow profile from the trolley, and unclip the cover from the flow profile.
› Slide the profile out of the fabrics.
8.f MOUNTING THE FABRIC FIXATION RAIL
› Screw the fabric fixation rail to the frame. (1)
› Re-slide the first flow profile on to the first and second fabric. (2)
› Clip the cover on the flow profile and hook the first flow profile into the first trolley. (3)
› Provide each trolley of a blocking. (4)
› Provide each flow profile with an end cap at both sides. (5)
Fabric fixation rail
Fabric fixation rail
01
DIN7504 Ø4,2x13
Содержание B300XL
Страница 19: ...OL B300 17 04 05 drain 02 03...
Страница 26: ...OL B300 24...