
OL-B300-12
8 ASSEMBLY SLIDING COVER
8.a ARMS AND ROLLERTUBE
› Place the arm on the mainhousings and make sure that the end and head piece cover the inserts M6.
› The arm with the longest hooks is positioned on the side to which you want the rainwater to flow, with the arm with the
shortest hooks on the other side. With a construction with 3 arms you position the third arm in the middle.
› Position the arm parallel to the frame and place the outer arms right next to the vertical poles. See drawing.
› Make sure the attachment lip on the rollertube-side of the arm is directed to the inside.
› Tension the bolts at the end and head piece.
1. STAND ALONE
2. ENCLOSED MODULE
1. STAND ALONE
1
2
W2
W2
DIN7504 Ø4,2x13
DIN933 M6x25
DIN9021 M6
insert M6
0
Attachment lip
W2
W1
Содержание B300XL
Страница 19: ...OL B300 17 04 05 drain 02 03...
Страница 26: ...OL B300 24...