OL-B300-13
2. ENCLOSED
› The arm with the longest hooks is positioned on the side to which you want the rainwater to flow, with the arm with the
shortest hooks on the other side. With a construction with 3 arms you position the third arm in the middle.
› Place the arms on the main housings and slide them together to the bearing-side just above the main housing L-side. (1)
› Make sure the first trolley of each arm is in the same position (see previous page).
› Slide the rollertube through both arms, first through the arm on the motor-side. (2)
› Split up the arms again until they are positioned right next to the vertical poles. Then put the head piece and end piece of
both arms over the socket set screws . (3)
› Put the nuts on the socket set screws at the head and end piece. (3)
Arm motor-side
Arm bearing-side
1
2
Arm motor-side
Arm bearing-side
Rollertube
Rollertube
Motor
› Check if the first trolley of each arm is in the same position (dimension A)
› In case it's not, turn the belt until they are in the same position.
› After checking the position, slide the rollertube through the bearings, first slide through the arm at the motor side.
TOPVIEW
First trolley's
A
SIDE VIEW
First trolley
Arm motor-side