Preparation
26
Z33119_2_003
Release and remove the transport safety
lock, which are the two butterfly nuts at the
bottom of the BCU I housing (1).
Position the BCU I taking the magnetic fringe field into account.
• For Ascend™ (all frequencies) and all other magnets ≤ 700MHz: Place the BCU I
outside 0.5mT (5 G) and not less than 1m from the axis of the magnet.
• For magnets ≥ 750MHz: Place the BCU I outside the 5mT (50 G) and not less than
2.7m from the axis of the magnet.
Unscrew and remove the white protective
cover (1) at the end of the transfer line
before pressurizing the BCU I with VT gas
(max 6 bar).
Install the support clamp (Z53660) to the
magnet flange.
Assemble and install the transfer line
support BSCU support (Z119100) for
systems with a transfer line >2m.
Содержание SmartCooler BCU I
Страница 1: ...SmartCooler BCU I User Manual Version 003 Innovation with Integrity NMR...
Страница 12: ...Safety 12 Z33119_2_003...
Страница 18: ...Introduction 18 Z33119_2_003...
Страница 28: ...Preparation 28 Z33119_2_003...
Страница 30: ...Installation 30 Z33119_2_003...
Страница 39: ...Troubleshooting Z33119_2_003 39 9 Troubleshooting Please refer to the table on the following page...
Страница 42: ...Troubleshooting 42 Z33119_1_003...
Страница 44: ...Replacement of Parts 44 Z33119_2_003...
Страница 48: ...Contact 48 Z33119_2_003...
Страница 49: ...Z33119_2_003 49...
Страница 50: ...Bruker Corporation info bruker com www bruker com Order No Z33119...