Installation Instructions 125 MAX DD2 evo
Page 31/70
Edition 09/2016
Æ
Mount Bowden cable
with shift contact guidance (pos. 1)
to the retaining plate (pos.
2).
Fig. 43
Æ
Mount Allen screw (pos. 1), lock washer (pos. 2) and spacer
(pos. 3)
together with
the
shift contact guidance
(pos. 4) onto the engine housing.
Tightening torque 22 Nm.
Fig. 44
Æ
The alignment between point -1- and point -2- must be given. Otherwise it can
cause increased friction, which has a negative impact on shifting behavior.
Fig. 45
Содержание ROTAX 125 MAX DD2 evo
Страница 2: ...Page 1 70 Edition 09 2016 General information BRP Rotax recommends products of the following companies...
Страница 5: ...Page 4 70 Edition 09 2016 INSTALLATION INSTRUCTIONS FOR ROTAX ENGINE TYPE 125 MAX DD2 evo...
Страница 41: ...Installation Instructions 125 MAX DD2 evo Page 40 70 Edition 09 2016 K00365 Fig 58...