Installation Instructions 125 MAX DD2 evo
Page 26/70
Edition 09/2016
12.
Installation of the battery and ECU
12.1.
Install ECU into the battery holder
Æ
Prepare two rubber pads (pos. 1) and the control unit (pos. 2) for installation.
Fig. 24
Æ
Install the control unit into the respective rubber pad.
TIP:
Align at the triangular bottom of the control unit. It only fits the rubber pad in one
position.
Æ
Place the upper rubber pad (pos. 1) onto the control unit
.
Fig. 25
Æ
Insert the complete unit into the battery holder.
¿
Note:
If difficulties during insertion occur, the inside of the battery holder can be slightly
bent inward so that the distance increases. See Fig. 26
Also, a bit of silicone spray may ease the installation.
Содержание ROTAX 125 MAX DD2 evo
Страница 2: ...Page 1 70 Edition 09 2016 General information BRP Rotax recommends products of the following companies...
Страница 5: ...Page 4 70 Edition 09 2016 INSTALLATION INSTRUCTIONS FOR ROTAX ENGINE TYPE 125 MAX DD2 evo...
Страница 41: ...Installation Instructions 125 MAX DD2 evo Page 40 70 Edition 09 2016 K00365 Fig 58...