![BROWN Firefly Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/brown/firefly/firefly_user-manual_2820255004.webp)
BrownDigital FireFly set-up guide
Assembly Step 1: Ensure Adequate Clearance
Before placing the Firefly modules, it is important to
ensure adequate clearance will be available for both the
main footprint of the machine and maintenance access.
Since the Firefly Curing System is a modular system, the
main footprint of the machine depends on the exact
configuration you purchased. Consult your salesperson
for an engineering drawing of your particular system.
Clearance is required around the heat modules in order
to open control panel doors, pull out filters, and clean
camera boxes. See
Figure 7
for specific clearance
numbers.
Figure 7: GENERAL CLEARANCES
Clearance is also required for the heat modules to slide
on their tracks for maintenance access to the center of
the machine. Ensure that nothing blocks the movement
of the heat sections front/back as shown in
Figure 8
.
Figure 8: ACCESSING CENTER OF SYSTEM
2
Содержание Firefly
Страница 8: ...BrownDigital FireFly set up guide Appendix A Firefly Machine Wiring Diagrams 6 ...
Страница 9: ...BrownDigital FireFly set up guide Figure A 1 1 Lane Firefly Machine Wiring Diagram 7 ...
Страница 10: ...BrownDigital FireFly set up guide Figure A 2 2 Lane Firefly Machine Wiring Diagram 8 ...
Страница 11: ...BrownDigital FireFly set up guide Figure A 3 3 Lane Firefly Machine Wiring Diagram 9 ...