3. INSTALLATION
RH-9820
13
3-8. Installing the operation panel
(1) Operation panel
(2) Screws [4 pcs.]
1. Pass the cord of the operation
panel (1) through the table hole.
2. Loosen the two screws (3) at the
rear of the control box, open the
cord presser plate (4) in the
direction of the arrow, and pass the
cord through the hole into the box.
(Refer to “3-1. Table processing
diagram” for details on the
installation position for the
operation panel.)
NOTE:
Check that the operation panel cord
is not being clamped when
screwing the operation panel into
the table. The cord may become
damaged if it is clamped.
3-9. Installing the cotton stand
Install the cotton stand so that it is at the far left of the table
when looking from the front of the sewing machine.
* Do not use the thread guide (1) which is provided a an
accessory with the cotton stand.
(2) Cotton stand
(3) Washer
(4) Nut
NOTE:
•
Tighten the nut to secure the cotton stand firmly so that it
will not move.
•
The cotton stand can also be installed on the far right side
of the table, but if this is done, the threading method will
change. (Refer to “4-5. Threading the thread when the
cotton stand is installed on the right side”.)
0355B
0356B
Operator
0357B
Содержание RH-9820
Страница 7: ...RH 9820 v Belt cover Rear 0331B 0332B 0334B 0486B 0485B 0333B ...
Страница 133: ...MEMO RH 9820 124 ...