LK3-B438E Mark II
11
Be sure to connect the ground. If the ground connection is not secure, you run the risk of receiv-
ing a serious electric shock, and problems with correct operation may also occur.
t
e
w
r
w
r
q
e
t
q
CAUTION
Table
Table
Red
White
Black
Yellow/Green
3-11 . Installing the operation panel
1. Install the rear frame
q
to the work table (top or bottom) with the four wood screws
w
.
2. Install the front frame
e
to the rear frame
q
with the four screws
r
.
* The vertical orientation of the front frame
e
is the same whether it is installed to the top or the bottom of
the work table.
3. Insert the connector cord
t
into the control box through the hole at the side of the box. Refer to “3-13.
Connecting the cords” for details on connecting the cord.
4. Secure the connector cord
t
with the staples (in three places).
3-12 . Connecting the ground wire
Connect to the power switch. However, the
black wire is insulated to the inside of the box
and is not used.
3. INSTALLATION
The operation panel can be installed to either the top or bottom of the work table.
Top of work table
Bottom of work table
Connect to ground