4 - 9
Adjustment
Adjustment
Needle bar rise adjustment
1. Attach the front cover.
2. Hold down the backstitching button and the selecting button (right), and turn the power on (the buzzer must sound
four times).
3. Select pattern number [02].
4. Press the [REV] key four times to select the left base line.
5. Attach the J foot and lower the presser hoot lifter.
6. Turn the pulley by hand, moving the needle bar to its lowest point.
7. Remove the base cover.
8. Loosen the set screws (socket (CP) M5 x 5) (two) on lower shaft pulley D.
9. Rotate the outer rotary hook manually so that the right edge of the needle is aligned with the tip of the outer rotary
hook when the needle bar is raised 2.9 to 3.3 mm from the reference line of the lowest point.
10. Fully tighten the set screws (socket (CP) M5 x 5) on lower shaft pulley D.
11. Attach the base cover.
Socket set screws
(CP, M5x5) (2 pcs.)
Lower shaft pulley D
Draw a reference line
extending from the lowest
point of the needle bar.
The right edge of the needle is aligned
with the tip of the outer rotary hook when
the needle bar is raised 2.9 to 3.3 mm
from the lowest point.
2.9-3.3mm
2.9-3.3mm
Содержание BC800
Страница 2: ......
Страница 3: ...LIST of UPDATE RECORD Jul 2010 Date Added Models Contents CONFIDENTIAL Aug 2015 BC800 Aug 2016 FS50 ...
Страница 9: ...vi ...
Страница 17: ...1 8 ...
Страница 19: ...2 2 Main parts location diagram Main unit ...
Страница 36: ...2 19 Disassembly Feed unit location diagram Main unit ...
Страница 44: ...2 27 Disassembly Needle presser unit location diagram Main unit ...
Страница 53: ...3 2 Main parts location diagram Main unit ...
Страница 72: ...3 21 Main parts Main unit Assembly 30 Accessory table attachment 1 Attach the accessory table 1 1 ...
Страница 73: ...3 22 Feed unit location diagram Main unit ...
Страница 85: ...3 34 Needle presser unit location diagram Main unit ...
Страница 97: ...3 46 ...
Страница 119: ...4 22 ...
Страница 121: ...5 2 Adjustment LED lamp right supply assy Pass the lead wires between 2 bosses and then attach the thread guide assy B ...
Страница 123: ...5 4 Adjustment Operation PCB supply assy S36 and S37 models S33 and S34 models ...
Страница 125: ...5 6 Adjustment Lead wire assy Power LE Lead wires should pass inside the rib ...
Страница 126: ...5 7 Adjustment Special Instructions of Wiring BH switch assy ...
Страница 130: ...5 11 Adjustment Special Instructions of Wiring FC jack supply assy Lead wires should pass behind the motor ...
Страница 131: ...5 12 ...
Страница 134: ...LOW END COMPUTER SERIES 22M04HF885S33 34 36 37 LOW ENDCOMPUTERSERIES ...