5 - 3
Adjustment
S
pecial Instructions
of
W
irin
g
Operation PCB supply assy and SSVR PCB supply assy
Lead wires should be tied
near the edge of cover.
Lead wires should
be tied just above
the leftmost rib.
S33 and S34 models
S36 and S37 models
Lead wires should be tied
near the edge of cover.
Lead wires should
be tied just above
the leftmost rib.
Содержание BC800
Страница 2: ......
Страница 3: ...LIST of UPDATE RECORD Jul 2010 Date Added Models Contents CONFIDENTIAL Aug 2015 BC800 Aug 2016 FS50 ...
Страница 9: ...vi ...
Страница 17: ...1 8 ...
Страница 19: ...2 2 Main parts location diagram Main unit ...
Страница 36: ...2 19 Disassembly Feed unit location diagram Main unit ...
Страница 44: ...2 27 Disassembly Needle presser unit location diagram Main unit ...
Страница 53: ...3 2 Main parts location diagram Main unit ...
Страница 72: ...3 21 Main parts Main unit Assembly 30 Accessory table attachment 1 Attach the accessory table 1 1 ...
Страница 73: ...3 22 Feed unit location diagram Main unit ...
Страница 85: ...3 34 Needle presser unit location diagram Main unit ...
Страница 97: ...3 46 ...
Страница 119: ...4 22 ...
Страница 121: ...5 2 Adjustment LED lamp right supply assy Pass the lead wires between 2 bosses and then attach the thread guide assy B ...
Страница 123: ...5 4 Adjustment Operation PCB supply assy S36 and S37 models S33 and S34 models ...
Страница 125: ...5 6 Adjustment Lead wire assy Power LE Lead wires should pass inside the rib ...
Страница 126: ...5 7 Adjustment Special Instructions of Wiring BH switch assy ...
Страница 130: ...5 11 Adjustment Special Instructions of Wiring FC jack supply assy Lead wires should pass behind the motor ...
Страница 131: ...5 12 ...
Страница 134: ...LOW END COMPUTER SERIES 22M04HF885S33 34 36 37 LOW ENDCOMPUTERSERIES ...