3 - 45
Needle-presser unit
Main unit
Assembly
15
LED lamp left assembly
1. Attach the LED lamp L assembly
1
with the screw
1
.
NOTE
• Align the boss
2
on the LED lamp L assembly
1
with the hole
on the base holder
3
.
1
Torque
1.18 – 1.57 N
·
m
1
1
3
2
Screw, Pan (S/P washer)
M
4X8DA
Color; Silver
16
Threader hook attachment
1. Pull the needle thread slider
1
toward you, and then align the D-cut of the
threader hook assembly
2
with the D-cut of the needle thread shaft
3
.
1
3
2
Содержание BC800
Страница 2: ......
Страница 3: ...LIST of UPDATE RECORD Jul 2010 Date Added Models Contents CONFIDENTIAL Aug 2015 BC800 Aug 2016 FS50 ...
Страница 9: ...vi ...
Страница 17: ...1 8 ...
Страница 19: ...2 2 Main parts location diagram Main unit ...
Страница 36: ...2 19 Disassembly Feed unit location diagram Main unit ...
Страница 44: ...2 27 Disassembly Needle presser unit location diagram Main unit ...
Страница 53: ...3 2 Main parts location diagram Main unit ...
Страница 72: ...3 21 Main parts Main unit Assembly 30 Accessory table attachment 1 Attach the accessory table 1 1 ...
Страница 73: ...3 22 Feed unit location diagram Main unit ...
Страница 85: ...3 34 Needle presser unit location diagram Main unit ...
Страница 97: ...3 46 ...
Страница 119: ...4 22 ...
Страница 121: ...5 2 Adjustment LED lamp right supply assy Pass the lead wires between 2 bosses and then attach the thread guide assy B ...
Страница 123: ...5 4 Adjustment Operation PCB supply assy S36 and S37 models S33 and S34 models ...
Страница 125: ...5 6 Adjustment Lead wire assy Power LE Lead wires should pass inside the rib ...
Страница 126: ...5 7 Adjustment Special Instructions of Wiring BH switch assy ...
Страница 130: ...5 11 Adjustment Special Instructions of Wiring FC jack supply assy Lead wires should pass behind the motor ...
Страница 131: ...5 12 ...
Страница 134: ...LOW END COMPUTER SERIES 22M04HF885S33 34 36 37 LOW ENDCOMPUTERSERIES ...