12
����
����
����
����
����
����
����
����
����
����
1.2.2
Joining the Rail
The stairlift rail is shipped in two pieces that are spliced together during installation.
The upper and lower charge points and upper and lower stopping limit ramps are installed
on the rail sections at the factory.
Before positioning,
it is recommended, whenever possible, to join the
rail together at the base of the stairway making assembly easy.
1.
On the bottom rail, loosen the 3 pinch bolts and slide out the 1 inch square
joint-bar until it protrudes approximately 4 ½ inches. Tighten the 3 pinch bolts.
2.
On the upper section of the rail, temporarily
remove the screw from where the gear rack
will go when fully assembled.
3.
Connected to the lower charge point and
running through the inside of the lower rail
section is a two wire cable that terminates
with two female wire connectors.
Connect the male and female wire
connectors of the rail cable together
(brown to brown, blue to blue).
Содержание Stairlift
Страница 1: ...BROOKS STAIRLIFTS SUPERGLIDE 120 INSTALLATION PROCEDURES...
Страница 5: ...Pre Installation Procedure 5 Open the bag that contains the remotes batteries and keys...
Страница 6: ...Box Contents 6 CARRIAGE BOX...
Страница 7: ...7 SEAT BOX...
Страница 8: ...8 RAIL BOX...
Страница 31: ...31...
Страница 32: ...2006 Brooks Stairlifts REGISTER YOUR BROOKS STAIRLIFT AT www brooksstairlifts com register...