11
1.2
INSTALLATION PROCEDURE
1.2.1
Preparation on Site
It is recommended that the following examinations be carried out prior to taking
the rail into the end users’ property:
1.
Visually check the site making sure that all
obstructions such as window sills, pipes,
bulkheads, newel posts etc have been
allowed for.
2.
Examine the stairs, remove any removable
objects that may get damaged or could cause
a tripping hazard when the rail is brought into
the property.
If the stairway is open plan or there is access to the rear of the
installation (not against a wall), then the installation must not go
ahead until the access has been panelled off.
3.
Identify existing damage to:
Decorations
Floor coverings, furniture and
other furnishings
Windows, doors, etc
4.
Do not remove the handrail until the rail has been installed, in case of
mis-measure / abort.
Wire
Side
strippers
cutters
Hammer Drill
Torch
Optional
Содержание Stairlift
Страница 1: ...BROOKS STAIRLIFTS SUPERGLIDE 120 INSTALLATION PROCEDURES...
Страница 5: ...Pre Installation Procedure 5 Open the bag that contains the remotes batteries and keys...
Страница 6: ...Box Contents 6 CARRIAGE BOX...
Страница 7: ...7 SEAT BOX...
Страница 8: ...8 RAIL BOX...
Страница 31: ...31...
Страница 32: ...2006 Brooks Stairlifts REGISTER YOUR BROOKS STAIRLIFT AT www brooksstairlifts com register...