background image

4

9.17.052

4.5

Mounting position (integrated) valve with purge connector

Only for 

mini CORI-FLOW™ 

instruments with (integrated) liquid valve with purge adaptor, mounting position 

can be critical for a good quality of de-gassing.

i

www

Please consult the Instruction Manual for additional information on mounting the mini CORI-FLOW instruments. This
document can be found in the download section of our website: 

coriolis.bronkhorst.com/en/downloads/

instruction_manuals/

 

Liquid purging

In order to remove gas bubbles during start-up, flushing with relatively high flow rate of liquid for some minutes is
recommended.

Gas purging

In order to remove condensation drops during start-up, flushing with dry gas for some minutes with high flow rate is
recommended.

Leak tightness

Verification of leaks is required prior starting up of the process.

5

Leak check

Check the system for leaks before applying (fluid) pressure. Especially if toxic, explosive or other dangerous fluids
are used!

Gas tight is not the same as liquid tight

Please note that connections which are tight for liquid, could still be untight for gas. This can result in Air enclosure
in the liquid, e.g. when using pumps, which might lead to errors in measurement.

6

Electrical connection

Electrical connections must be made with a standard cable or according to 
the

 mini CORI-FLOW™

 hook-up diagram.

mini CORI-FLOW™

 instruments have a IP65 ingress protection rating.

Optional mini CORI-FLOW™

 instruments can be ATEX Zone 2 protected. For ATEX Zone 2 applications, all

(optional) connectors and the impact protection cover must be mounted on the instrument.

7.1

Analog/Local operation

Connect the 

mini CORI-FLOW™

 to the power supply/readout unit with the 8-pin cable at the circular connector.

The two examples below have the following electrical properties:

Power

Analog

output

Analog input

(controller)

: +15...+24 Vdc

: 0...5 Vdc / 0...10 Vdc
 0...20 mA / 4...20 mA

: 0...5 Vdc / 0...10 Vdc
  0...20 mA / 4...20 mA

Example 1 

Example 2 

Содержание mini CORI-FLOW

Страница 1: ...Quick Installation Guide Doc nr 9 17 052H Date 10 12 2015 ...

Страница 2: ...Plot Manual document nr 9 17 030 Depending on optional fieldbus interface Fieldbus interface description Manual Hookup diagram RS232 Interface with FLOW BUS protocol 9 17 027 9 16 044 FLOW BUS Interface 9 17 024 9 16 048 PROFIBUS DP Interface 9 17 025 9 16 049 DeviceNet Interface 9 17 026 9 16 050 Modbus interface 9 17 035 9 16 066 i www These documents can be downloaded from the website https www...

Страница 3: ... water particles may cause undesired reactions such as corrosion 4 1 Mount install instrument properly Install the mini CORI FLOW Meter Controller in the line and tighten the fittings according to the instructions of the supplier of the fittings Mount the mini CORI FLOW instrument with screws in the body to a rigid stiff base body or heavy mass such as a wall heavy rig or stable steel construction...

Страница 4: ...leaks before applying fluid pressure Especially if toxic explosive or other dangerous fluids are used Gas tight is not the same as liquid tight Please note that connections which are tight for liquid could still be untight for gas This can result in Air enclosure in the liquid e g when using pumps which might lead to errors in measurement 6 Electrical connection Electrical connections must be made...

Страница 5: ...Special control mode for purging In case of a mini CORI FLOW controller give setpoint 100 to control the valve or the pump It is also possible to use special control mode 8 to fully open the valve or set the pump at max rpm using a digital interface This will bypass the PID controller and might be usefull when having the mini CORI FLOW set to a low capacity It will ensure you to get the highest po...

Страница 6: ...The red LED will blink when signal is unstable noisy Make sure that there is no flow through the mini CORI FLOW when performing the zeroing procedure and avoid vibrations 45 sec 10 5 Ready When indication is showing 0 signal and the green indication LED is continuously on then zero has been performed well Instrument is in normal operation mode now and ready for use Measurement check For a controll...

Отзывы: