page 8
9.17.010
BRONKHORST
®
2 INSTALLATION
2.1 Receipt of equipment
Check the outside packing box for damage incurred during shipment. Should the packing box be damaged,
then the local carrier must be notified at once regarding his liability, if so required. At the same time a report
should be submitted to:
BRONKHORST HIGH-TECH B.V.
RUURLO HOLLAND
Remove the envelope containing the packing list; carefully remove the equipment from the packing box.
Do not discard spare- or replacement parts with the packing material and inspect the contents for damaged
or missing parts.
2.2 Return shipment
When returning material, always describe the problem and if possible the work to be done, in a covering
letter.
It is absolutely required to notify the factory if toxic or dangerous gases have been metered with the
instrument!
This to enable the factory to take sufficient precautionary measures to safe-guard the staff in their repair
department. Take proper care of packing, if possible use the original packing box; seal instrument in plastic
etc.
All instruments must be dispatched with a completely filled in 'declaration on contamination form'. (In the
back of this manual)
Instruments without this declaration will not be accepted.
Note:
If the instruments have been used with toxic or dangerous gases the customer should pre-clean the
instrument.
Important:
Clearly note, on top of the package, the customer clearance number of BRONKHORST HIGH-TECH B.V.,
namely:
NL801989978B01
2.3 Service
If this equipment is not properly serviced, serious personal injury and/or damage to the equipment could be
the result. It is therefore important that servicing is performed by trained and qualified service personnel.
Bronkhorst
®
has a trained staff of servicemen available.
2.4 Mounting position
Bronkhorst
®
strongly advises to mount the CEM in a vertical position, with the control valve section pointing
upwards and the vapour output pointing downwards.
Avoid installation in close proximity of mechanic vibration or strong heat sources.
2.5 Liquid filling
The purge connector can be used to remove the air from the liquid system. If available, use vacuum to de-
aerate the valve and liquid flowmeter before filling with liquid.
Содержание CEM
Страница 2: ...page 2 9 17 010 BRONKHORST ...
Страница 6: ...page 6 9 17 010 BRONKHORST ...
Страница 13: ...APPENDIX Recommendations for handling the Bronkhorst DLI CEM system Vacuum system Non Vacuum system ...
Страница 14: ...BRONKHORST 1 ...