Appendix , page 3
Startup using Vacuum
A) To fill the system:
Procedure:
Actions:
A1) Evacuate the lines “Vacuum”
Start pumps
A2) Evacuate all lines
Close: 2,3,5,10 and 9.
Connect inert gas on carrier gas inlet.
Open : 1,4,7,11.
Give setpoint to gas and liquid control
(the control valves 6 and 8 open).
Pump for a long time.
Remark: if the system is not completely
dry follow procedure of E3, E4, (E5).
A3) Purge line between inert gas source and
valve 2.
Close: 4.
Open valve 2 briefly for some seconds.
A4) Purge line between process gas source and
gas MFC.
Give setpoint = 0 to LFM (6 closes).
Open valve 9 briefly for some seconds.
A5) Pump down liquid supply.
Open 3 for some time, close 3.
A6) Pressurize liquid supply.
Close 1, give right pressure on inert gas
supply. Open 2, open 3 briefly.
A7) Fill the system with liquid.
(1)
Let gas flow in the carrier gas line during
filling of the system.
Close 7.
Open 5 briefly, allow mixing valve 6 to fill.
A8) Optional: degassing mixing valve.
Open 7, a needle valve will be best, to
avoid too much liquid be pumped away.
A9) The system is now ready for use.
Vacuum
Liquid
1
4
3
5
6
8
10
11
9
MFC
Carrier
Processgas
Vacuum
7
LFM
Inertgassupply
2
Process
Vacuum
Valve
Heatedline
CEM
Liquid
Gas
Содержание CEM
Страница 2: ...page 2 9 17 010 BRONKHORST ...
Страница 6: ...page 6 9 17 010 BRONKHORST ...
Страница 13: ...APPENDIX Recommendations for handling the Bronkhorst DLI CEM system Vacuum system Non Vacuum system ...
Страница 14: ...BRONKHORST 1 ...