
2-16
TWO-PART LINE REEVING
When resting the downhaul or sheave block on the ground for changing it, use the
following procedure to prevent fouling the load line on the hoist. Raise the boom about 5
feet (1.52 m) and lower the hoist until the hook nearly touches the ground. Then lay the
hook on the ground by lowering the boom, not the hoist.
Содержание IC-35-2G
Страница 6: ...1 2 DIMENSIONS AND ORIENTATION IC 35 2G...
Страница 7: ...1 3 TURNING DIMENSIONS...
Страница 16: ......
Страница 29: ...2 13 CRANE CAPACITY CHART FOR IC 35 2G...
Страница 30: ...2 14 CRANE CAPACITY CHART FOR IC 35 2G METRIC...
Страница 38: ......
Страница 47: ...3 9 IC 35 LUBRICATION CHART...
Страница 51: ...3 13 JIC SCHEMATIC...
Страница 52: ...3 14 JIC SCHEMATIC METRIC...
Страница 54: ...3 16 STEERING SYSTEM...
Страница 56: ...3 18 IC 35 PROPULSION SYSTEM...
Страница 70: ......
Страница 71: ......