background image

EZ80C 

  

Installation Guide

Page 3

Punch out 
Template from 
packaging. See 
Step 3.

Installation - Replace an Existing Fan

Tools needed

• Phillips screwdriver (recommended)

• Hammer

• Safety glasses

• Pencil

• Tape Measure

• Drywall saw

Materials needed

•  4" round metal ducting recommended for best performance.  Use of  

  other ducting is acceptable but may impact performance.

•  Roof cap or wall cap (built-in damper recommended)

•  Tape to seal duct connections

•  Drywall screws, sheet metal screws (optional)

•  Electrical wiring and supplies per local code requirements 

1

  Remove from Packaging

2

  Prepare the Housing

Loosen 2 blower 
screws.

Unplug blower 
and remove 
blower from 
housing.

1

2

3

Remove wiring cover.

Содержание EZ80C

Страница 1: ...Register your product online at www broan ca register asp Easy installation Table of Contents Warnings and Cautions 2 Operation 2 Cleaning and Maintenance 2 Troubleshooting 2 Typical Installation 2 In...

Страница 2: ...earing damage and noisy and or unbalanced impellers keep drywall spray construction dust etc off power unit 5 Please read specification label on product for further information and requirements 45 45...

Страница 3: ...ound metal ducting recommended for best performance Use of other ducting is acceptable but may impact performance Roof cap or wall cap built in damper recommended Tape to seal duct connections Drywall...

Страница 4: ...N O F N E W F A N S D U C T C O N N E C T O R For retrofit installations Place this edge against ceiling framing See installation instructions Mark center line of existing fan on ceiling 2 Position t...

Страница 5: ...ceiling material to properly secure housing in place Minimum ceiling thickness to be 1 2 CAUTION Do not overtighten clamps with a power driver Ceiling material may become deformed and prevent proper...

Страница 6: ...e and wiring cover to inside of housing with screws provided Plug blower into receptacle and re install blower Tighten blower screws 7 Connect Electrical Wiring 8 Replace Blower 9 Install Grille Squee...

Страница 7: ...against ceiling framing with bottom edge of housing flush with finished ceiling Use 4 screws to attach housing to framing Optional for additional support After ceiling is finished rotate the tighteni...

Страница 8: ...sion is held to be prohibited or invalid such provision shall be ineffective only to the extent of such prohibition or invalidity without invalidating the remainder of such provision or the other rema...

Отзывы: