53-1005235-09 Installation Guide
Brocade
®
G630 Switch Hardware Installation Guide
4. Position a cable so that the key (the ridge on one side of the cable connector) is aligned with the slot in the transceiver.
Insert the cable into the transceiver until the latching mechanism clicks.
NOTE
Cables are keyed so that they can be inserted in only one way. If a cable does not slide in easily, ensure that
it is correctly oriented.
Verifying the Operation of New Transceivers
You can use the following commands to verify if the transceivers are working correctly:
•
errDump
•
fabricShow
•
sfpShow
•
switchShow
Refer to the
Brocade Fabric OS Command Reference Manual
for output examples and descriptions.
53-1005235-09
62
Содержание Brocade G630-1
Страница 99: ......