53-1005235-09 Installation Guide
Brocade
®
G630 Switch Hardware Installation Guide
e) Complete the remaining prompts or press
Ctrl+D
to accept the remaining settings without completing all the
prompts.
f) Re-enable the switch by entering the
switchEnable
command.
Verifying Correct Operation
Perform the following steps to verify the correct operation of the device.
1. Check the LEDs to verify that all components are functional.
2. Verify the correct operation of the device by entering the following commands from the workstation.
Command
Description
errDump
Displays any errors
fanShow
Displays fans status and information
historyShow
Displays the device history
psShow
Displays power supply status and information
switchShow
Displays switch status and information
tempShow
Displays temperature status and information
The
switchShow
command provides the following information about the device and its ports.
E_G630_2:admin> switchshow
switchName: E_G630_2_209
switchType: 184.1
switchState: Online
switchMode: Native
switchRole: Subordinate
switchDomain: 209
switchId: fffcd1
switchWwn: 10:00:d8:1f:cc:05:3f:bb
zoning: ON (fos6k)
switchBeacon: OFF
FC Router: OFF
Fabric Name: 0123456_FID1
HIF Mode: OFF
Allow XISL Use: ON
LS Attributes: [FID: 1, Base Switch: No, Default Switch: No, Ficon Switch: No, Address Mode 0]
Index Port Address Media Speed State Proto
==================================================
0 0 d10000 id N32 No_Light FC
1 1 d10100 id N16 No_Light FC
2 2 d10200 id N16 No_Light FC
(truncated)
3 3 d10300 -- N32 No_Module FC
4 4 d10400 -- N32 No_Module FC
5 5 d10500 -- N32 No_Module FC
6 6 d10600 -- N32 No_Module FC
7 7 d10700 -- N32 No_Module FC
8 8 d10800 -- N32 No_Module FC
9 9 d10900 -- N32 No_Module FC
53-1005235-09
54