background image

 

 

2.1 Service Clearances 

For servicing, a minimum clearance of 750mm shall be provided on all three sides as shown in Diagram 
2,  and  extend  vertically  to  one  meter  above  the  heater  roof.    Consideration  shall  be  made  for  flue 
terminal location and clearance requirements; refer to heater installation manual. 

 

Diagram 2: 

Icebox Service Clearances

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
2.2 Icebox Supply & Return Air Side

 

The 10kW Icebox model is available in left hand orientation (DINIB10Z7-L) and right hand orientation 
(DINIB10Z7-R).  The 13kW and 15kW Icebox is available in left hand orientation from factory with the 
capability of being converted to right hand orientation. 

 

Diagram 3: 

Icebox Supply & Return Air Side

 

 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DINIB10Z7-L 
DINIB13Z7 
DINIB15Z7 

 

Return Air 

Supply Air 

 

Return Air 

Supply Air 

DINIB10Z7-R 

Service Clearance 

5

0

0

 

750 

Building Wall 

750 

Содержание DINIB10Z7-L

Страница 1: ...Brivis Inverter Icebox R410A INSTALLATION INSTRUCTIONS PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLING USING THIS PRODUCT Bonus offer when you register your product online brivis com au ...

Страница 2: ...3 CONDENSATE DRAIN 10 4 4 ELECTRICAL CONNECTION 10 4 5 FLASHING WIRING INSTALLATION 10 4 6 MOUNTING AND SECURE THE HEATER 14 4 7 WIRING THE ICEBOX TO A BX3 BX5 HEATER 15 5 0 SYSTEM AND DUCTWORK DESIGN 16 5 1 FILTRATION 16 6 0 CONDENSER UNIT INSTALLATION 16 7 0 SPECIFICATIONS 17 IMPORTANT NOTICE To be read in conjunction with Brivis ICE Inverter Installation Start Up Maintenance User Operating Guid...

Страница 3: ...C10Z7 DINIB10Z7 R 10 9 4 4 8 10 1 All Buffalo 20XA DONSC13Z7 DINIB13Z7 13 12 4 6 3 13 6 All Buffalo 26 DONSC15Z7 DINIB15Z7 15 14 7 7 5 16 0 All Buffalo 26XA Ensure minimum specified air quantity requirements passes through the ICE cooling coil at all times Ductwork and fittings must be sized to handle the total cooling airflow through the system on either whole home or zoned basis 1 2 Safety Warni...

Страница 4: ...uthority Local Building Regulations Environment Authorities Building Code of Australia BCA Brivis SuperSizeGuide Brivisize It is recommended the Brivis SuperSizeGuide Brivisize be followed in estimating cooling requirements and for system design that will result in efficient installation and provide a higher level of comfort and economical operation Brivis assumes no responsibility for equipment i...

Страница 5: ...nual Diagram 2 Icebox Service Clearances 2 2 Icebox Supply Return Air Side The 10kW Icebox model is available in left hand orientation DINIB10Z7 L and right hand orientation DINIB10Z7 R The 13kW and 15kW Icebox is available in left hand orientation from factory with the capability of being converted to right hand orientation Diagram 3 Icebox Supply Return Air Side DINIB10Z7 L DINIB13Z7 DINIB15Z7 R...

Страница 6: ...e for the 13kW or 15kW Icebox do the following 1 Remove the three screws supporting the Top Rail and relocate to the opposite side 2 Remove the ten screws supporting the Pop Cover Plate and relocate to the opposite side Diagram 4 Changing Supply Return Air Side Top Rail Pop Cover Plate ...

Страница 7: ...efer to the General Arrangement drawings 3 2 Starting Collars Insert starting collar pop into the hole in pop plate ensuring pop flange is placed over the inner supply air wall of the cabinet Spread the pop flange to fit tight in the cabinet s hole with the notch side of the collar over lapping the other Secure the pops with the rivets supplied Rivets Supplied Pop Flange IMPORTANT HEATER FLUE THIS...

Страница 8: ...screws have been supplied in a bag with this installation manual and are required to secure the heater to the Icebox 4 0 ICEBOX INSTALLATION Diagram 8 Typical Icebox Installation Item Description Quantity 1 Heater Support Bracket 1 2 Flashing Top 1 3 Flashing Left Hand 1 4 Flashing Right Hand 1 Model Flashing Kit Number Width 150mm Width 250mm DINIB10Z7 L B062743 B062744 DINIB10Z7 R B062743 B06274...

Страница 9: ...ed at condenser end only 4 1 Location Choose a location that is suitable for refrigeration piping and condensate drainage Adequate provision shall be made available for service access Where the unit is installed the wall of the building shall be capable of effectively anchoring the heater Never put the Icebox coil unit in the return air part of the duct system this may result in condensation formi...

Страница 10: ...ctricity supply shall be 220 to 240 Volt at 50 Hz and from an authorised power supplier Generators should never be used as their output may be incompatible with or prone to damage the unit s electronic components 4 5 Flashing Wiring Installation Note A qualified electrician must install the 220 to 240 Volt wiring according to local regulations Flashing Top Slide 4 Slide the top flashing in from ei...

Страница 11: ...g for cable access Diagram 12 Wiring into the Icebox Diagram 13 Flashing Condensate installation 7 Run a bead of silicone on the flashing faces that will mate with the house 8 Push Icebox into position up against the building wall 9 Install condensate drain Note 3 core shielded communication cable shall be installed from the Icebox unit Terminals Q P E to the condenser unit The shield of the cable...

Страница 12: ...12 Diagram 14 3 Core shielded communication cable between indoor and outdoor units 3 Core Shielded Communication cable P Q E Condenser PCB Shield Icebox PCB ALARM Q E X P Y E ON OFF ...

Страница 13: ...oil Temperature T2B Suction Temperature Field Wiring Control Wiring 240 Wiring Power Supply 240VAC 50Hz 3 Core shielded cable Communication cable from Icebox to condenser For condenser connection refer to Diagram 14 2 Core cable 24VAC from heater or programmable thermostat Note For installation requirements of the outdoor condenser refer to the installation manual supplied with it ...

Страница 14: ...n the bracket to accommodate all heaters and only two are utilised 3 Using suitable screws item 2 field supplied secure bracket to the building wall 4 Remove the six screws from the base of the heater as shown 5 Replace with the six long series screws supplied with the unit 1 2 Diagram 16 Securing heater support bracket Diagram 17 Securing heater to base box Note The Heater Support Bracket can be ...

Страница 15: ...ostat W Rc EARTH For connection refer to installation instruction supplied with B063033 Loom add on relay classic Brivis Networker INDOOR UNIT ELECTRIC BOX M Fn A1 A2 Heater cabinet wall Grommet Icebox PCB relay connections Heater Parameter H01 ID07 5 24VAC NG 2A G W R Electronic Control Module C Y TSTAT TW1 TW2 ZONE ADD ON ZONE A ZONE B 516 Zone Module ZONE B ZONE D Refrig ZONE C ZONE A N O 0V N ...

Страница 16: ...to accept the full air capacity of the system at low noise levels Adequate air filtration must be provided If the system uses high level outlets e g ceiling diffusers then the return air inlet should be at a low level 5 1 Filtration A filter must be fitted into the system and should be easily accessible for regular cleaning Please refer to the guidelines for return air filter grilles accompanying ...

Страница 17: ...17 7 0 Specifications ...

Страница 18: ...18 Notes ...

Страница 19: ...19 Notes ...

Страница 20: ...is Climate System Pty Ltd ABN 64 096 079 088 AU 24752 Issue A Brivis Climate Systems Pty Ltd 2015 All rights reserved No part of these documents may be used in any way or form without prior written consent from Brivis Climate Systems Pty Ltd ...

Отзывы: