CJWinter Page 10
4.
Unlock the Adjusting Sleeve (#14) by removing the #8-32 SHCS (#21) and
the Spline Brake (#19) at the
rear of the Shank (#6).
5.
Add backlash to the gear
train by unthreading the
Adjusting Sleeve (#14) until
the top of master pinion is
protrudes roughly 3/16"
above flush with the top of
the Center Plate (#3).
6.
Make sure the Thrust Washers (#11 & #22), Thrust Bearings (#10),
Eccentric Roll Pins (#20) and the Carbide Bushings (#5) all are freshly
oiled, and free from any contaminants.
7.
Oil the ID and faces of the knurl rollers, and slide them onto the Carbide
Bushings/Eccentric Roll Pins.
8.
Reassemble Front Plate (#1).
9.
Turn the Adjusting Sleeve (#14) in, to tighten the backlash until the rolls
just bind, and then back off slightly until they rotate freely. Lock the
backlash adjustment by re-installing the Spline Brake (#19) and #8-32
SHCS (#21).
Note: Step #9 can be delayed if you need to adjust part size, as it will just
need to be repeated again later.
Содержание CJWINTER 192 Series
Страница 1: ...192 Series Precision Involute Knurl Spline Tools Instruction Manual ...
Страница 16: ...Assembly Drawing ...