45
Treadwall M6 Pro Owner’s Manual—2017
Main Channel Assembly
This finishes the installation except for putting on the climbing holds, Ladder Line, and
installing the last climbing panel.
Install the Ladder Line first. Followed by the climbing holds, there is a short guide in this
manual (Page 7 and 8).
When everything is in place test the wall at different angles and speeds. Finally, put on
the last panel and cover the access holes.
Put on the post pads under the
cables as shown and secure
with 4 wire ties. The ties are
spaced evenly along the length
of the post pad starting 2" from
each end and secured with
moderate tension. Line up the
buckles on the cable ties with
the seam, orient them to the
bottom of the rail, and trim off
the excess tie.
Slide the mat under the wall to
the back of the A-frame with the
shortest fold to the rear.
The mat is held in place by
loops, Buckle these around the
front legs
Содержание Treadwall M6 Pro
Страница 2: ......
Страница 4: ...ii Treadwall M6 Pro Owner s Manual 2017...
Страница 6: ...2 Treadwall M6 Pro Owner s Manual 2017...
Страница 8: ...4 Treadwall M6 Pro Owner s Manual 2017...
Страница 14: ...10 Treadwall M6 Pro Owner s Manual 2017...
Страница 16: ...12 Treadwall M6 Pro Owner s Manual 2017...
Страница 50: ...46 Treadwall M6 Pro Owner s Manual 2017...
Страница 52: ...48 Treadwall M6 Pro Owner s Manual 2017...