Finish up
Slide the mat
under the wall
to the back of
the support
frame.
This finishes the installation except for putting on the ladderline
and climbing holds, going through the final check list (next page)
and installing the last climbing panel.
Climbing hold instructions are included in each box. Install the
ladderline first.
When everything is in place go through the check list, put on the
last panel and cover the access holes.
Page 16
M6-V install 1-15-16
Brewer's Ledge Inc.