17 / 60
NOTICE! During the assembly make sure that the upper
part of the wind vane is minimum 1.5 metres off the
ground.
Assembly on a vertical or horizontal wooden element
1.
Remove the screws from the bottom housing part.
2.
Pull off the rod clamp from the bottom housing part.
3.
Insert one end of the mounting rod into the opening of
the rod clamp so that the position arrows match.
4.
Fix the mounting rod to the rod clamp with a thin par-
tially threaded screw and a nut.
5.
Depending on the desired orientation, slide the oppos-
ite end of the mounting od into the aperture for vertical
or horizontal mounting of the mounting base.
6.
Fix the mounting rod to the mounting base with a thin
partially threaded screw and a nut.
7.
Place the mounting base with its bottom site first on a
wooden element and fix it with 4 suitable wood screws.
Assembly on a vertical or horizontal tube
8.
Repeat steps 1 to 6 as before.
9.
Place the mounting base with its bottom site first on the
tube and press the tube clamp (counterpart) against the
tube from the opposite site.
10. Slide 4 screws through the bore holes of the mounting
base and through the bore holes of the tube clamp on
the other site.
11. Put on the 4 nuts and tighten the screw connection by
hand.