B.
VERTICALLY WITH NEW CHIMNEY SYSTEM
(Refer to
Figure 9a & 9b)
NOTE:
Follow L-Vent chimney manufacturer’s instructions.
OPTION:
To achieve a center vertical installation a 45º elbow and a
clean-out tee can be used to offset the pipe from the exhaust outlet
to the rear center of the stove (see figure 9a). You can also use the
P24FS Vertical Install Kit (part # A-VIK) (see figure 9b).
OPTION:
Install L-Vent elbow in place of clean-out tee. Locate
stove. Drop plumb bob to center of tee outlet, mark point on ceiling.
Install ceiling support and L-Vent pipe per L-Vent manufacturer’s
instructions.
1. Always maintain 3” clearance from combustible materials.
When passing through additional floors or ceilings, always
install firestop spacer.
2. After lining up for hole in roof, cut either around or square hole
in roof, always 3” larger all the way around pipe. Install upper
edge and sides of flashing under roofing materials, nail to the
roof along upper edge. Do not nail lower edge. Seal nail heads
with non-hardening waterproof mastic.
3. Apply non-hardening, waterproof mastic where the storm collar
will meet the vent and flashing. Slide storm collar down until it
sits on the flashing. Seal and install cap. Mobile home
installations must use a spark arrester.
INSTALLATION
8
FIGURE 9a
FIGURE 9b
www.PelletKing.com
Содержание Tradition P24FS
Страница 23: ...MAINTENANCE 23 FIGURE 29 www PelletKing com...
Страница 30: ...FIGURE 30 ELECTRICAL DIAGRAM 30 www PelletKing com...