
3
2.1 UNPACK AND INSPECT
Remove the packing from the appliance and inspect for any damage. Ensure that the bricks are positioned correctly and not broken
(see illustration for proper brick arrangement). Make sure that the baf
fl
e board, above the air tubes, is in place and undamaged. DO
NOT remove the baf
fl
e board.
2.2 TOOLS AND MATERIALS NEEDED FOR INSTALLATION
A 7/16” socket wrench
A 5/16” socket (Best if using a power drill and a socket bit)
A pair of pliers or channel-locks
A power drill with an 1/8” drill bit to install sheet metal screws into connector pipe.
Sheet metal screws
A non-combustible
fl
oor protector as speci
fi
ed in this manual
All chimney and chimney connector components required for your particular venting installation.
2.0
PRE-ASSEMBLY
BRICK CONFIGURATION
Содержание SWC21
Страница 20: ...20 2 6 5 5 10 11 9 8 1 17 14 4 3 3 7 13 15 16 12...
Страница 21: ...21 NOTES...