background image

 

Load diagram 

Load diagram 

Load diagram 

Load diagram 

 

 

 

 

 
 
 
 
 
 

 

Percentage of operating time 

 

5.2.

 

MATERIAL

 

AND

 

FINISH 

5.2.1 All parts of the jack are manufactured from steel and cast iron. 
 
5.2.2. Materials inclinable to creation of an incendiary spark in terms of the annex  
 

No. 2 article 1.3.1 to the ministerial order No. 116/2016 of the Coll. of Laws and 
the 

Č

SN EN 1127-2 article 6.4.4 

Č

SN EN 1127-1 article 6.4.4 and EN ISO

 

80079-

36 article 6.4.2.1 harmonized technical standards are not used. 

 
5.2.3. Materials with dangerous effects of static electricity within the meaning of the 

Č

SN 

EN  1127-2  article  6.4.7, 

Č

SN  EN  1127-1  article  6.4.7,  EN  ISO  80079-36  article 

6.7 and 

Č

SN 

Č

SN CLC/TR 60079-32-1 are not used in the chain block. 

 
5.2.4  The  jack  does  not  exceed  the  noise  values  specified  in  the  Annex  No.1  article 

1.7.4.2 letter u of the ministerial order No. 176/2008 of the Collection of Law (EP 
and RE directive No. 2006/42/EC). 

 
Note: Articles 5.2.2 and 5.2.3 3 apply to NEXP product design. 

 

 

5.3

 

DATA

 

ON

 

THE

 

PRODUCT 

Each product is equipped with the label with specified data as follows: 

Standard finish: 

NEXP product design: 

Mark of the producer 

Mark of the producer 

Address of the producer  Address of the producer 
Product type 

Product type 

Load capacity 

Load capacity 

Serial number 

Serial number 

Production year 

Production year 

CE marking 

CE marking 

 

Protection type symbol (

IM2ExhIMb

 for group I, 

II2GExhIICT6Gb 

and

 II2DExhIIICT85°CDb 

for group II) 

 

 
 
 
 
 
 
 

Содержание 15-00-CON

Страница 1: ...load capacity 10t CONTAINER WALL MOUNTED CONSTRUCTION CON W CONTAINER DESIGN CON these versions are further available in variants DESIGN WITH RATCHET CRANK RK DESIGN WITH RATCHET HANDLE LEVER RKP DES...

Страница 2: ...N 10 7 2 SAFETY WORK ENVIRONMENT 10 8 JACK CHECK 11 8 1 INSPECTION 11 8 1 1 Inspections types 11 8 1 2 Daily inspection 11 8 1 3 Regular inspection 11 8 1 4 Jack occasionally used 11 8 1 5 Report on i...

Страница 3: ...plant etc The weight of a movable part of a structure when handling does not have to exceed specified permitted load capacity of the jack 2 2 The jack by its design meets requirements provided by Dir...

Страница 4: ...nsure the jack would be operated by physically fit qualified and instructed persons older than 18 years familiarized with the operation manual and trained in security of work and mode of operation ALW...

Страница 5: ...the approval of the producer 4 PACKING STORAGE AND HANDLING 4 1 PACKING 4 1 1 Jacks are supplied in assembled state in bulk in transport cases 4 1 2 The following accompanying documentation is a part...

Страница 6: ...0 C to 500 C 12 8 15 2 17 0 15 00 CON 11 4 13 8 15 6 15 00 CON W 5 360 850 550 22 1 25 6 28 5 15 00 CON 19 0 22 5 25 4 15 01 CON W 10 345 825 540 35 40 45 15 01 CON 33 38 43 Dimensions Type design Loa...

Страница 7: ...he load diagram Tab 5 1 MECHANICAL CLASSIFICATION Load diagram load distribution Definition Load coefficient Average daily operating time h 1 light Jacks usually being subject to the low load and only...

Страница 8: ...article 6 4 7 EN ISO 80079 36 article 6 7 and SN SN CLC TR 60079 32 1 are not used in the chain block 5 2 4 The jack does not exceed the noise values specified in the Annex No 1 article 1 7 4 2 lette...

Страница 9: ...bar ends with 25 mm 2 5t load capacity or 30 mm 5t 10t load capacity serve for mounting to a structure 6 1 2 Product design CON The manufacturer of the equipment in which the jack will be used specifi...

Страница 10: ...nt that there is the symbol of the protection type marked on the label see articles 2 3 2 4 and 5 3 of this OM 7 1 2 The jack is operated by a crank Jacking up and lowering of a structure can be inter...

Страница 11: ...inspection also during operation in the interval between regular inspections Qualified employees will determine whether any defect or damage can constitute a hazard and whether the detailed inspectio...

Страница 12: ...o retighten released parts 2 Regular inspection carried out by competent person Part Inspection method Limit criterion for putting out of operation Remedy 1 Fixative parts Visual inspection of all scr...

Страница 13: ...grease solvent and apply new grease Use grease specified by the producer Lifters of load capacity 2 5 5 a 10t are equipped with a lubrication plug on the cover of the gear transfer We recommend regula...

Страница 14: ...mark disabled or repaired jack with appropriate inscription i e OUT OF OPERATION NEVER carry out maintenance if there is a load on the jack NEVER work with the jack that is under repair ALWAYS when r...

Страница 15: ...orm maintenance in clean environment 2 NEVER disassemble the jack more than it is necessary to carrying out the needful repair 3 NEVER use excessive power when dismantling parts 4 NEVER use heat fire...

Страница 16: ...and Council directive 2014 34 EU SN EN ISO 12100 SN EN 1494 A1 SN EN 1127 2 SN EN 1127 1 SN EN ISO 80079 36 SN EN ISO 80079 37 Regulation of CBM Czech Bureau of Mine No 22 89 of the Collection of Law...

Отзывы: