3 SECURITY PRINCIPLES 

3.1

 

SECURITY

 

PRINCIPLES

 

OVERVIEW 

A hazard exists when handling movable parts of structures especially in the event that 
the  jack  is  not  use  in  the  right  way  or  is  badly  maintained.  Whereas  as  a  result  an 
accident  or  severe  injury  could  happen,  it  is  necessary  to observe  the  special  security 
measures when handling, assembling, maintaining and checking the jack. 
 

 !  VAROVÁNÍ 

ALWAYS 

ensure  the  raised  part  of  the  structure  against  drop  (e.g.  by  brace  rod),  if 
you intend to work under it. 

NEVER 

jack up persons. 

NEVER 

burden the jack more than is the load capacity indicated on the jack. 

ALWAYS 

warn persons in surroundings before starting work. 

ALWAYS 

read the operation manual and security instructions. 

Bear in mind that the operation staff is responsible for faultless technique of raising. 
Hence  verify  all  national  directives,  regulations  and  standards  whether  they  contain 
other information on safety work with your jack. 

 
3.2.

 

SECURITY

 

PRINCIPLES 

 !  WARNING 

3.2.1 Prior to use 
ALWAYS 

ensure  the  jack  would  be  operated  by  physically  fit,  qualified  and 
instructed  persons  older  than  18  years,  familiarized  with  the  operation 
manual and trained in security of work and mode of operation. 

 

ALWAYS 

check up the jack every day before starting work according to Section 8.2. 
(1) „Daily inspection“. 

 

NEVER

  

use the defective or outworn jack. 

NEVER 

use the jack without visible load capacity marking on the jack. 

NEVER 

use the jack marked with the label „

OUT OF OPERATION

“. 

ALWAYS 

consult the producer or his authorized representative any application of the 
jack in nonstandard or extreme environment. 

ALWAYS

 

check  that  the  product  is  grounded  through  the  ground  terminal  when 

working in an explosive atmosphere 

ALWAYS

 wipe off any dust before handling the product in an explosive atmosphere 

 

3.2.2 When in use 
ALWAYS 

make sure the jack is properly mounted in equipment construction. 

ALWAYS 

pay increased attention, if the jack is drawn up to maximum position. 

ALWAYS 

work with the jack only with manpower.  

ALWAYS 

we  recommend  with  respect  to  actuating  forces  the  jack  operation  is 
ensured  by  two  persons  when  handling  parts  of  structures  the  weight  of 
which approximate to safe working load of the hoister. 

Содержание 15-00-CON

Страница 1: ...load capacity 10t CONTAINER WALL MOUNTED CONSTRUCTION CON W CONTAINER DESIGN CON these versions are further available in variants DESIGN WITH RATCHET CRANK RK DESIGN WITH RATCHET HANDLE LEVER RKP DES...

Страница 2: ...N 10 7 2 SAFETY WORK ENVIRONMENT 10 8 JACK CHECK 11 8 1 INSPECTION 11 8 1 1 Inspections types 11 8 1 2 Daily inspection 11 8 1 3 Regular inspection 11 8 1 4 Jack occasionally used 11 8 1 5 Report on i...

Страница 3: ...plant etc The weight of a movable part of a structure when handling does not have to exceed specified permitted load capacity of the jack 2 2 The jack by its design meets requirements provided by Dir...

Страница 4: ...nsure the jack would be operated by physically fit qualified and instructed persons older than 18 years familiarized with the operation manual and trained in security of work and mode of operation ALW...

Страница 5: ...the approval of the producer 4 PACKING STORAGE AND HANDLING 4 1 PACKING 4 1 1 Jacks are supplied in assembled state in bulk in transport cases 4 1 2 The following accompanying documentation is a part...

Страница 6: ...0 C to 500 C 12 8 15 2 17 0 15 00 CON 11 4 13 8 15 6 15 00 CON W 5 360 850 550 22 1 25 6 28 5 15 00 CON 19 0 22 5 25 4 15 01 CON W 10 345 825 540 35 40 45 15 01 CON 33 38 43 Dimensions Type design Loa...

Страница 7: ...he load diagram Tab 5 1 MECHANICAL CLASSIFICATION Load diagram load distribution Definition Load coefficient Average daily operating time h 1 light Jacks usually being subject to the low load and only...

Страница 8: ...article 6 4 7 EN ISO 80079 36 article 6 7 and SN SN CLC TR 60079 32 1 are not used in the chain block 5 2 4 The jack does not exceed the noise values specified in the Annex No 1 article 1 7 4 2 lette...

Страница 9: ...bar ends with 25 mm 2 5t load capacity or 30 mm 5t 10t load capacity serve for mounting to a structure 6 1 2 Product design CON The manufacturer of the equipment in which the jack will be used specifi...

Страница 10: ...nt that there is the symbol of the protection type marked on the label see articles 2 3 2 4 and 5 3 of this OM 7 1 2 The jack is operated by a crank Jacking up and lowering of a structure can be inter...

Страница 11: ...inspection also during operation in the interval between regular inspections Qualified employees will determine whether any defect or damage can constitute a hazard and whether the detailed inspectio...

Страница 12: ...o retighten released parts 2 Regular inspection carried out by competent person Part Inspection method Limit criterion for putting out of operation Remedy 1 Fixative parts Visual inspection of all scr...

Страница 13: ...grease solvent and apply new grease Use grease specified by the producer Lifters of load capacity 2 5 5 a 10t are equipped with a lubrication plug on the cover of the gear transfer We recommend regula...

Страница 14: ...mark disabled or repaired jack with appropriate inscription i e OUT OF OPERATION NEVER carry out maintenance if there is a load on the jack NEVER work with the jack that is under repair ALWAYS when r...

Страница 15: ...orm maintenance in clean environment 2 NEVER disassemble the jack more than it is necessary to carrying out the needful repair 3 NEVER use excessive power when dismantling parts 4 NEVER use heat fire...

Страница 16: ...and Council directive 2014 34 EU SN EN ISO 12100 SN EN 1494 A1 SN EN 1127 2 SN EN 1127 1 SN EN ISO 80079 36 SN EN ISO 80079 37 Regulation of CBM Czech Bureau of Mine No 22 89 of the Collection of Law...

Отзывы: