background image

 

15

11 MAINTENANCE 

11.1 SECURITY PRINCIPLES 

 

!  WARNING

 

Only qualified persons (service organizations), trained in safety and maintenance of the 
jacks, can carry out maintenance and professional inspections. 

 

ALWAYS 

use entirely components supplied by the producer. 

 

It is not permitted to carry out repairs and maintenance in other way than specified 
by the producer. It means namely the forbiddance of using unoriginal spare parts 
or carrying out of changes on the product without the approval of the producer.   

ALWAYS 

test the jack function after carrying out the maintenance (see chapter 6.5). 

ALWAYS 

mark  disabled  or  repaired  jack  with  appropriate  inscription  (i.e. 

„OUT  OF 

OPERATION“

). 

NEVER 

carry out maintenance if there is the load on the jack. 

NEVER 

work with the jack that is under repair! 

 

11.2

 

REPLACEMENT

 

OF

 

BRAKE

 

INSERTS

 

AND

 

BRAKE

 

ADJUSTING 

11.2.1 Brake disassembly (fig. 6) 

Demount  the  crank-lever  from  the  jack.  Put  the  lever  in  the  neutral  position  (see  Fig. 4) 
Demount  the  safety  ring  (8)  and  take  off  the  crank  arm  (7).  Unbolt  safety  screws  (6)  and 
consequently  the  nut  (5).  Take  out  the  spring  (4)  and  consequently  the  carrier  segment  (7A). 
Take out from the hub (1) the ratchet (3) with brake insert (2), take off the brake insert (2), and 
replace both brake inserts (2). 

 

 

 

 

 

 

 

 

 

 

 

 

Fig 6 

Fig. 7 

7A 

4 to 6 mm 

Содержание 15-00-CM

Страница 1: ...INTENANCE FOR RACK JACK WITH A RATCHET CRANK LEVER type 15 00 CM 5t 15 01 CM 10t Peruse the operation manual before using the jack It comprehends substantial security instructions and instructions for...

Страница 2: ...APPLICATION OF THE JACK 10 7 2 SAFETY WORK ENVIRONMENT 11 8 CHECK UP ON THE JACK 12 8 1 INSPECTION 12 8 1 1 Inspections types 12 8 1 2 Daily inspection 12 8 1 3 Regular inspection 12 8 1 4 Jack occas...

Страница 3: ...egulation ministerial order No 176 2008 of the Collection of Laws as amended as well as requirements of the SN EN ISO 12100 and SN EN 1494 harmonized technical standards 2 3 The jack by its design mee...

Страница 4: ...or faultless technique of raising loads Hence verify all national directives regulations and standards whether they contain other information on safety work with your jack 3 2 SECURITY PRINCIPLES WARN...

Страница 5: ...ons can be done that will be in accordance with producer s requirements stated in the chapter 11 of this OM IT IS NOT PERMITTED to carry out repairs and maintenance in other manner than specified by t...

Страница 6: ...y special storage position 4 3 HANDLING During transportation and handling observe technical regulations and standards in force for work with heavy loads 5 MAIN TECHNICAL SPECIFICATIONS Type Load capa...

Страница 7: ...or load approximating to the maximum 0 80 k 1 00 0 12 0 25 Load diagram Load diagram Load diagram Load diagram 1 2 3 4 Percentage of operating time 5 2 MATERIAL AND FINISH 5 2 1 All parts of the jack...

Страница 8: ...he jack see chapter 6 5 ALWAYS safeguard the jack against drop at pushing or spreading out of loads i e in horizontal direction A drop can take place when shifting the load and thereby unloading and r...

Страница 9: ...through of the brake namely at manipulation with heavier loads In this case release the brake by more point blank motion thereby you will coincidently release the ratchet crank 6 3 RATCHET CRANK LEVER...

Страница 10: ...suitable load 10 till 50 of the load capacity At the same time verify whether the jack will hold firmly the load without slipping when lowering and stopping 7 OPERATION 7 1 APPLICATION OF THE JACK 7 1...

Страница 11: ...s according to the chapter 3 of this OM 7 2 SAFETY WORK ENVIRONMENT Warning 1 The operating personnel must be demonstrably acquainted with this Operation Manual they must adhere to valid security and...

Страница 12: ...inspection also during operation in the interval between regular inspections Qualified employees will determine whether any defect or damage can constitute a hazard and whether the detailed inspectio...

Страница 13: ...r inspection carried out by the competent person Part Inspection method Limit criteria for putting out of operation Remedy 1 Fixative parts Visual inspection of all screws nuts rivets etc Faulty or mi...

Страница 14: ...ASING 10 1 GENERALLY Before application of the grease remove old grease clean up components with grease solvent and apply new grease Use grease specified by the producer vaseline lubricant grease PM A...

Страница 15: ...rying out the maintenance see chapter 6 5 ALWAYS mark disabled or repaired jack with appropriate inscription i e OUT OF OPERATION NEVER carry out maintenance if there is the load on the jack NEVER wor...

Страница 16: ...e heat fire as the mean when dismantling parts if the parts are destined for next use 5 Keep the workplace clean and without foreign materials that could get into bearings and other movable parts 6 If...

Страница 17: ...Law as amended EP and Council directive 2014 34 EU SN EN ISO 12100 SN EN 1494 SN EN 1127 2 SN EN 1127 1 SN EN 13463 1 Regulation of CBM Czech Bureau of Mine No 22 89 of the Collection of Law SN 33 20...

Страница 18: ...destined entirely for underposable raising and lowering of free loads at normal atmospheric conditions in the workplace when observing the specified maximum load capacity Is in conformity with the fol...

Отзывы: