background image

7

Installation 

S19-323, S19-324

Bradley • 

215-1846 Rev. C; ECN 17-05-068 

11/21/2017

2 Connect Signaling Assembly to Flow Switch

To prevent water condensation from 
dripping onto the flow switch, make 
sure the cable is not taut.

A

Plug the prewired cable into the 
socket provided in the flow switch 
junction box . The plug and socket 
have an alignment pin and groove 
which makes for error-free hook-up .

B

Tighten the locking collar on the 
female cable socket by rotating it 
clockwise after plugging in . This 
makes a good watertight connection .

3 Complete electrical supply connections

WARNING  To prevent personal injury and damage to the components, follow all manufacturer's 

warnings and instructions when performing any maintenance or installation of 
components used in this emergency signaling system.

C

If unit is an S19-324 with flex mount 
selector switch option, determine 
mounting location of selector 
switch and size flexible cable length 
accordingly . Hook up the wires 
from the provided flexible cable to 
control board (see wiring diagram) 
while the cover is off . Attach the 
connector cable to the flex mount 
selector switch . Mount the selector 
switch enclosure to desired location 
(hardware provided by installer) .

B

Run electric power conduit (3/4" 
conduit hub provided) and AWG 18 
minimum power wire into the hole 
to the floating terminal block per the 
wiring schematic .

Compliance and conformity to 
local codes and ordinances is 
the responsibility of the installer.

D

Close the hinged cover and tighten 
the four screws .

Prewired Cable

Flow Switch 

Junction Box

Locking Collar

See wiring diagram and schematic 
on pages 13-14.

A

Loosen, but do not remove, the four 
screws on the front of the hinged 
cover .

E

Turn on supply power to the signaling 
system  .Test the signaling system at 
this time .

Do not exceed 14 AWG wire.

NEMA 3R flow switch shown, 
NEMA 4X flow switch connects 
the same way.

Flex Mount 

Assembly 

(S90-641)

Содержание S19-323

Страница 1: ...EMA 4X Emergency Signaling System Table of Contents Pre Installation Information 2 3 Components 4 5 Install Flow Switch and Mount Assembly 6 Connect Signaling Assembly to Flow Switch 7 Complete Electr...

Страница 2: ...e beginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall...

Страница 3: ...gency fixtures require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any...

Страница 4: ...1mm NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 3R Junction Box and Cover Electrical Quick Disconnect Male 3 76mm 4 11 16 119mm Red Blue Black Remote Sensing 12 3 8 315mm System is pr...

Страница 5: ...10 9 16 269mm Beacon Light Type 4X Shown Optional NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 5 16 84mm Red Blue Black Rem...

Страница 6: ...nections C Choose a location for mounting the alarm For best visibility the signaling system should be mounted at least 7 above ground level The signaling system may be mounted directly to the drench...

Страница 7: ...option determine mounting location of selector switch and size flexible cable length accordingly Hook up the wires from the provided flexible cable to control board see wiring diagram while the cover...

Страница 8: ...flow will automatically reset the silence feature The alarm signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The alarm will continue to...

Страница 9: ...ensure the integrity of the unit G Check that the signaling station is functioning properly once the power is restored by activating the fixture attached to the signaling station S19 323 Signal Light...

Страница 10: ...Component failure Check light connections and filament in the light Area light does not operate No power to the signal station Check that the circuit breaker or fuse is supplying power to the signal...

Страница 11: ...ket Alarm Box GA 61 S90 634 1 General Area Hardware Kit Item Part No Qty Description 80 269 1421 1 Flowswitch 1 1 4 T DPDT 80 269 1522 1 Flowswitch 1 2 T DPDT 81 269 1902 1 Junction Box Conduit Outlet...

Страница 12: ...T 32 269 1316 1 Conduit Nipple 3 4 x 6 33 169 1145 1 Elbow Pulling Conduit Item Part No Qty Description 34 269 2156 1 Close Nipple 3 4 Conduit 36 269 2460 Plug 3 4 Conduit NEMA 41 229 010 1 Selector S...

Страница 13: ...C ECN 17 05 068 11 21 2017 Wiring Diagram NOTES 1 Devices in dashed boxes are optional 2 All powered devices are 24VDC 3 All wires are 18 AWG unless supplied with the device then those wires are to be...

Страница 14: ...ELAY COIL NORMALLY OPEN NORMALLY CLOSED LIGHT HORN FLOW SWITCH FLOW SENSOR COMPONENT SOLDERED WIRE LEGEND CONTACT CONTACT INTERNAL JUMPER TERMINAL BLOCK CONNECTION NORMALLY OPEN CONNECTION NORMALLY CL...

Отзывы: