Installation 

S19-323, S19-324

Bradley • 

215-1846 Rev. C; ECN 17-05-068 

11/21/2017

IMPORTANT

The installation and location of all safety drench showers, eye and eye/face washes must comply 

with the requirements of ANSI/ISEA Z358.1.

Read this installation manual completely to ensure proper installation, then file it with the owner 

or maintenance department. Compliance and conformity to local codes and ordinances is the 

responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before discarding any 

packaging material. If any parts are missing, do not begin installation until you obtain the missing 

parts.

Installation and maintenance of this system must be completed by a qualified plumber and 

electrician according to the information contained in this installation manual and in compliance 

with all national and local codes. 

 The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley 

plumbed emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure. 

Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable 

flushing fluid supply is present and any sediment build up in the supply line is cleared. Inspect 

safety equipment monthly to address any maintenance issues ensuring the equipment is in good 

operating condition and that there are no signs of wear.

Perform functional test upon relocation of safety equipment.

Workers who may come in contact with potentially hazardous materials should be trained 

regarding the placement and proper operation of emergency equipment per ANSI/ISEA Z358.1.

For questions regarding the operation or installation of this product, visit www.bradleycorp.com or 

call 800-BRADLEY (272.3539). 
Product warranties and parts information may also be found under ”Products” on our web site at 

bradleycorp.com.

Supplies Required

•  Teflon tape or pipe sealant
•  Black, white and green AWG 18 minimum (14 AWG maximum) wire to connect signaling system to electric 

power supply

•  3/4" hubs and fittings for electrical wiring (all customer supplied hubs and fittings must match the electrical 

rating of the enclosures)

Содержание S19-323

Страница 1: ...EMA 4X Emergency Signaling System Table of Contents Pre Installation Information 2 3 Components 4 5 Install Flow Switch and Mount Assembly 6 Connect Signaling Assembly to Flow Switch 7 Complete Electr...

Страница 2: ...e beginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall...

Страница 3: ...gency fixtures require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any...

Страница 4: ...1mm NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 3R Junction Box and Cover Electrical Quick Disconnect Male 3 76mm 4 11 16 119mm Red Blue Black Remote Sensing 12 3 8 315mm System is pr...

Страница 5: ...10 9 16 269mm Beacon Light Type 4X Shown Optional NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 5 16 84mm Red Blue Black Rem...

Страница 6: ...nections C Choose a location for mounting the alarm For best visibility the signaling system should be mounted at least 7 above ground level The signaling system may be mounted directly to the drench...

Страница 7: ...option determine mounting location of selector switch and size flexible cable length accordingly Hook up the wires from the provided flexible cable to control board see wiring diagram while the cover...

Страница 8: ...flow will automatically reset the silence feature The alarm signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The alarm will continue to...

Страница 9: ...ensure the integrity of the unit G Check that the signaling station is functioning properly once the power is restored by activating the fixture attached to the signaling station S19 323 Signal Light...

Страница 10: ...Component failure Check light connections and filament in the light Area light does not operate No power to the signal station Check that the circuit breaker or fuse is supplying power to the signal...

Страница 11: ...ket Alarm Box GA 61 S90 634 1 General Area Hardware Kit Item Part No Qty Description 80 269 1421 1 Flowswitch 1 1 4 T DPDT 80 269 1522 1 Flowswitch 1 2 T DPDT 81 269 1902 1 Junction Box Conduit Outlet...

Страница 12: ...T 32 269 1316 1 Conduit Nipple 3 4 x 6 33 169 1145 1 Elbow Pulling Conduit Item Part No Qty Description 34 269 2156 1 Close Nipple 3 4 Conduit 36 269 2460 Plug 3 4 Conduit NEMA 41 229 010 1 Selector S...

Страница 13: ...C ECN 17 05 068 11 21 2017 Wiring Diagram NOTES 1 Devices in dashed boxes are optional 2 All powered devices are 24VDC 3 All wires are 18 AWG unless supplied with the device then those wires are to be...

Страница 14: ...ELAY COIL NORMALLY OPEN NORMALLY CLOSED LIGHT HORN FLOW SWITCH FLOW SENSOR COMPONENT SOLDERED WIRE LEGEND CONTACT CONTACT INTERNAL JUMPER TERMINAL BLOCK CONNECTION NORMALLY OPEN CONNECTION NORMALLY CL...

Отзывы: