2
S19-292, S19-292PT
Installation
5/12/2014
Bradley •
215-1598 Rev. F; ECN 14-05-006
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it with the
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain
the missing parts.
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be
“ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation/installation of this product, visit bradleycorp.com or
call 800.BRADLEY (800.272.3539).
Product warranties may also be found under ”Products” at bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
•
•
•
•
P.O
. Bo
x 309,
Menomonee F
alls,
WI 53051
R
TEST
THIS
UNIT EA
CH
WEEK
Test-operate v
alv
e(s) eac
h week and sign
belo
w.
Repor
t an
y malfunctions immediatel
y.
Ventil(e) w
öc
hentlic
h im
Testbetrieb prüf
en,
bestätigt
dur
ch Unter
sc
hrift.
Jeglic
he Störung sof
or
t melden.
Date
Datum
Date
Signed
Unter
sc
hrift
Signe
Date
Date
Date
Signed
Signed
Signed
DIESES GERÄ
T 1ST
W
ÖC
HENTLICH ZU
PR
ÜFEN.
ESSAI HEBDOMA
DAIRE
Test le f
onctionnement des v
alves
c
haque semaine et
signe en bas.
S'il y à quelqu
e
ch
ose qui ne v
a pas fait
un rappor
t immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
• ½" NPT water supply to inlet on unit
• Bolts for cabinet mounting
• Pipe sealant
• Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.
OBSOLETE