background image

2

S19-220DCFW

 Installation

10/18/2012 

Bradley • 

215-158DCFW Rev. G; ECN 12-05-003C

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it with the 

owner or maintenance department. Compliance and conformity to drain requirements and 
other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before discarding 

any packaging material. If any parts are missing, do not begin installation until you obtain the 
missing parts.

Flush the water supply lines before beginning installation and after installation is complete. 

Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be 
"ON" at all times. Provisions shall be made to prevent unauthorized shutoff.

The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed 

emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid 
should be tepid per ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 

proper operation. This equipment should be inspected annually to ensure compliance with 
ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be trained 

regarding the placement and proper operation of emergency equipment per ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.bradleycorp.

com or call 1-800-BRADLEY. 

Product warranties may also be found under "Product Information" on our web site at www.

bradleycorp.com.

Installation

THIS

SIDE

UP

Packing List

P.

O.

 B

ox

 3

09

, M

en

om

on

ee

 F

all

s, 

W

I 5

30

51

R

TE

ST

 TH

IS

 U

NIT

 E

AC

W

EE

K

Te

st-

op

era

te

 va

lv

e(s

) e

ac

we

ek

 a

nd

 s

ig

be

lo

w.

Re

po

rt 

an

m

alf

un

cti

on

s im

m

edi

ate

ly.

Ve

ntil(e) 

ch

en

tlic

h im

 Te

stb

etrieb

 p

fe

n,

 b

es

tig

du

rc

Un

te

rs

ch

rift

. J

eg

lic

he

 S

ru

ng

 so

fo

rt 

m

eld

en

Date

Datum

Date

Signed

Unter

sc

hrift

Sign

e

Date

Date

Date

Signed

Signed

Signed

DIE

SE

GE

1S

T W

ÖC

HE

NT

LIC

ZU

 P

FE

N.

ES

SA

I H

EB

DO

M

AD

AI

RE

Te

st le

 fo

nc

tio

nn

em

en

t d

es

 valve

ch

aq

ue

 s

em

ain

et 

sig

ne

 e

ba

s. 

S'il 

à 

qu

elq

ue

 ch

os

qu

i n

va

 p

as

 fa

it 

 

un

 rap

po

rt im

m

éd

ia

te

m

en

t. 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Содержание S19-220DCFW

Страница 1: ...murale avec couvercle anti poussi res Lavador de ojos rostro para montaje en pared con cubierta guardapolvo Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Co...

Страница 2: ...recorded weekly to verify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials shoul...

Страница 3: ...wall OR install three suitable fasteners supplied by installer for bolts in the wall at the marked hole locations 3 Bolt the inlet drain fitting to the wall or wall fasteners using bolts supplied by...

Страница 4: ...ement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 051 2 6 7 3 5 4 1 4 3 4 11 4 2 4 1 6 1 5 1 4 1 3 1 2 1 1 1 8 1 9 1 7 1 4 4 NPT Suppl...

Страница 5: ...on fonctionement Notez les dates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati re...

Страница 6: ...ois attaches fournies par l installateur pour les boulons po dans le mur l emplacement des marques de trous 3 Boulonner au mur le raccordement d entr e du drain ou utiliser les attaches murales avec d...

Страница 7: ...7 3 5 4 1 4 3 4 11 4 2 4 1 6 1 5 1 4 1 3 1 2 1 1 1 8 1 9 1 7 1 4 4 Les l ments 1 1 1 9 arrivent pr assembl s comme l l ment 1 Approvisionnement l entr e NPT Drain de sortie 1 NOTE Fermer le couvercle...

Страница 8: ...ANSI Z358 1 Este equipo se debe inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma AN...

Страница 9: ...ed proporcionados por el instalador para pernos de en la pared en los lugares marcados para los orificios 3 Fije el accesorio de entrada de drenado a la pared o f jelo en la pared usando los soportes...

Страница 10: ...6 1 5 1 4 1 3 1 2 1 1 1 8 1 9 1 7 1 4 4 Las piezas 1 1 1 9 vienen preensambladas como Art culo 1 Salida de drenado 1 Entrada de suministro NPT NOTA Cierre lacubierta y tire del pasador a trav s del su...

Отзывы: