background image

2

S19-210DC

 

Installation

11/7/08 

Bradley Corporation • 

215-155DC Rev. J; ECN 08-538

WARNING

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly 
to verify proper operation. This equipment should be inspected annually to ensure 
compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per 
ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and service parts information may also be found under ”Products” 
on our web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Содержание S19-210DC

Страница 1: ...r pied avec cache poussi re ancr Lavaojos montado en pedestal con cubierta contra el polvo Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts L...

Страница 2: ...per operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the pla...

Страница 3: ...bolts in the floor 2 Bolt the base to the floor anchors using 3 8 bolts supplied by installer Step 2 Assemble eyewash 1 Assemble eyewash components as shown on page 4 Apply pipe sealant supplied by i...

Страница 4: ...um Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y...

Страница 5: ...009 1 Dust Cover Assembly 4 4 173 009 1 Cup Strainer 4 5 S21 071 1 Supply Pipe Assembly 4 6 113 1159 1 Spacer Drain 4 7 S05 091 1 Eyewash Yoke Assembly 4 8 269 447 1 Bumper 4 9 161 025 1 Hex Nut 5 11...

Страница 6: ...tes d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereuses...

Страница 7: ...de la base au sol 1 Poser les trois chevilles fournir pour les trois vis de 3 8 in dans le sol 2 Viser la base dans le sol avec trois vis de 3 8 in fournir tape 2 Montage 1 Monter le douche oculaire c...

Страница 8: ...ed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diate...

Страница 9: ...3 S90 009 1 Cache poussi re ancr 4 4 173 009 1 Filtre tamis 4 5 S21 071 1 Tuyauterie d alimentation 4 6 113 1159 1 Entretoise 4 7 S05 091 1 Assemblage de cadre 4 8 269 447 1 Butoir 4 9 161 025 1 crou...

Страница 10: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que p...

Страница 11: ...sorio y las puede proporcionar el contratista o las puede comprar en Bradley Corporation Paso 1 Afianzar la base al piso 1 Instalar los tres anclajes apropiados proporcionada por el instalador para lo...

Страница 12: ...IESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement P O BOX 309 M...

Страница 13: ...polvo 4 4 173 009 1 Coladera 4 5 S21 071 1 Conj del Tubo de Abastecimiento 4 6 113 1159 1 Espaciador 4 7 S05 091 1 Conj de la Horquilla del Lavaojos 4 8 269 447 1 Tope 4 9 161 025 1 Tuerca hexagonal...

Отзывы: