S59-1005SR
Installation
4
1/8/2020
Bradley
• 215-1674 Rev. F: ECO 19-03-024
A
Position valve with port labeled “UP” towards showerhead .
Connect valve to hot and cold supplies and showerhead
or tub spout supplies (see rough-in diagram .)
B
Turn on hot and cold supplies to pressurize valve and check for
leaks . (Valve will not operate unless both hot and cold supplies
are turned on .) Adjust maximum temperature by turning set
screw on valve cap .
C
H
E
Insert the 4 screws through the
escutcheon and into the valve body .
Tighten the screws, making sure that
the escutcheon is flush with the wall or
fixture and all 4 screws are tightened
equally .
WARNING! The temperature limit stop has been
factory preset for maximum temperature
operation. Failure to adjust the limit screw
to a safe shower temperature could result
in the user being scalded.
Connect Valve and Adjust Valve Temperature
2
Attach Escutcheon and Handle
3
D
Apply 100% silicone caulk to all
screw backsides prior to escutcheon
installation .
A
Slide handle over stem . Apply semi-
permanent thread locker to set screw
and tighten to ensure the screw is fully
engaged .
B
Apply supplied silicone
grease to o-ring to guide
escutcheon in place .
C
Slide escutcheon on
valve and align all 4
holes .
F
Apply security sealant
(if required) as
described below .
After installation, all joints
require security sealant (by
installer) to eliminate gaps,
if present, between the wall
and fixture.