Installation
S59-1000T1
Bradley Corporation
•215-1736Rev.B;EN12-03-009
8/7/2012
3
WARNING! The temperature limit stop has been factory
preset for maximum temperature operation.
Failure to adjust the limit stop to a safe shower
temperature could result in the user being
scalded.
A
Position valve with port labeled “UP” towards showerhead.
Connect valve to hot and cold supplies and showerhead
or tub spout supplies (see rough-in diagram.)
D
Turn on hot and cold supplies to pressurize valve and check for
leaks. (Valve will not operate unless both hot and cold supplies
are turned on.) Set limit stop by loosening set screw on limit
stop and repositioning to the desired temperature
(do not
remove the inner off-stop!)
C
H
To Showerhead
Up
Alignment
Mark on
Cap
Arrow
on Cap
Hot Limit
Stop
Off
Stop
Set Screw
You can fine-tune the hot limit
stop position 1/2 spline by
flipping it over.
Limit Stop
Normal
Limit Stop
Flipped
FOR "BACK-TO-BACK"
INSTALLATIONS
A
Turn off water supplies and remove (2)
hold-down screws from the "reversed"
valve. Rotate cap and cartridge
assembly 180° and re-install screws.
B
Remove both limit stops and rotate
180°. Align with alignment mark
as shown. Adjust hot limit stop the
same as for standard installation.
C
H
To Showerhead
Up
Arrow
on Cap
The included foam rim seal
may be applied to the back
of the escutcheon inside the
outer edge, with the seam at
the bottom.
1/4"
(6mm)
B
Set °F/°C selection as desired. Insert (2) AAA
batteries (supplied) and attach back housing.
(2) AAA
Alkaline
Batteries
°F/°C Slide
Switch
Silicone
Gasket
Back
Housing
Probe
C
Insert probe to depth shown
and tighten nut securely.
Probe/Tee
Orientation
(Top View)
45°
Connect Valve and Adjust Valve Temperature
2