21
Venting (Part II) continued-
THROUGH THE WALL VENTING: (HORIZONTAL VENTING)
Cut a 2 1/2 in.
(6.4 cm)
diameter hole in the wall at the point where the vent
connector is going to pass through the wall. Use the proper cement to secure
the 45° vent terminal provided with the water heater to the vent connector. The
distance between the edges of the 45° vent terminal and the exterior wall (see
Figure 7) must be at least 1 in.
(2.5 cm)
. Use the proper cement and assembly
procedures to secure the vent connector joints between the terminal and the
blower outlet. Provide support brackets for every 5 feet
(1.5 m)
of horizontal
vent.
3” VENT INSTALLATION
2” VENT INSTALLATION
Figure 7
IMPORTANT
All of the Venting connections must be leak checked with a soap and
water solution upon initial start up of the water heater. Any leaks must
be repaired before continuing operation of the water heater.
Содержание URG2PV50T6N
Страница 15: ...15 Venting Part I continued 4 V E N T IN S T AL L A TIO N 3 V E N T IN S T AL L A TIO N Figure 3...
Страница 34: ...34 Wiring Diagram Figure 10...
Страница 36: ...36 Lighting and Shutdown instructions...
Страница 48: ...48 NOTES...