14
Venting (Part I) continued-
NOTE: When using 4” (10.2 cm) vent pipe, use a 4” (10.1 cm) to 3” (7.6
cm) reducer and exit the building wall with 3” (7.6 cm) vent pipe using the
3” (7.6 cm) 90
vent terminal supplied. Two 45
elbows are equivalent to
one 90
elbow.
CONNECTION TO A 3” (7.6 CM) TO
4” (10.2 CM) REDUCER
CONNECTION TO 3” (7.6 CM)
VENT PIPE
Figure 2
THROUGH THE WALL VENTING: (HORIZONTAL VENTING)
Cut a 3 1/2 in.
(8.9 cm)
diameter hole in the wall at the point where the vent
connector is going to pass through the wall. Use the proper cement to secure
the 90° vent terminal provided with the water heater to the vent connector. The
distance between the edges of the 90° vent terminal and the exterior wall (see
Figure 3) must be 1 in.
(2.5 cm)
. Use the proper cement and assembly
procedures to secure the vent connector joints between the terminal and the
blower outlet. Provide support brackets for every 5 feet
(1.5 m)
of horizontal
vent.
IMPORTANT
All of the Venting connections must be leak checked with a soap and
water solution upon initial start up of the water heater. Any leaks must
be repaired before continuing operation of the water heater.
Содержание URG2PV50T6N
Страница 15: ...15 Venting Part I continued 4 V E N T IN S T AL L A TIO N 3 V E N T IN S T AL L A TIO N Figure 3...
Страница 34: ...34 Wiring Diagram Figure 10...
Страница 36: ...36 Lighting and Shutdown instructions...
Страница 48: ...48 NOTES...