36
SERVICE PROCEDURE RG-VII
Burner Operation Inspection,
Adjustment, Cleaning, and Replacement
BURNER CLEANING
Step 4. Disconnect the burner plate from main burner orifice
and disconnect feedline from burner.
Step 5. Remove main burner orifice from feed line.
Inspect and clean if necessary.
Step 6.
Step 7.
Step 8.
Remove pilot assembly, refer to Service Procedure RG-III for cleaning and inspection.
Using a stiff brush and compressed air, clean the burner plate and feedline, then reassemble
all components.
Inspect combustion chamber area of heater prior to reinstallation of burner assembly. If cleaning is
required, refer to Service Procedure RG-VIII.
Reinstall burner assembly into combustion chamber, reconnect feedline, thermocouple and pilot
tube to the combination thermostat/gas valve.
Reinstall inner door per Service Procedure RG-I.
To resume operation, follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Step 9.
Step 10.
Step 11.
36