7
GB
CONTENTS
Chapter
Page
1 -
Location
8
2 -
Installation
8
3 -
Power supply
12
4 -
Temperature threshold
14
5 -
Setting the clock
15
6 -
Heating or cooling programs
17
7 -
Automatic program
17
8 -
Manual operation
18
9 -
Holiday program
19
10 -
Plant running time
21
11 -
Viewing the programmed
temperatures
22
12 -
Stand-by mode
23
13 -
Timer-controlled plant
stand-by intervals
23
14 -
Replacing the batteries
26
15 -
Troubleshooting
29
16 -
Technical features
29
-
General guarantee terms
31
TH/124.02 ITF 2407-9422 01.07 15-01-2007 15:37 Pagina 7
Содержание TH124.01
Страница 9: ...9 GB Fig 4 Fig 5 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 9...
Страница 10: ...GB 10 Fig 6 Fig 7 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 10...
Страница 13: ...13 GB Fig 10 Fig 11 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 13...
Страница 28: ...GB 28 Fig 49 Fig 50 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 28...
Страница 39: ...39 D Abb 4 Abb 5 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 39...
Страница 40: ...D 40 Abb 6 Abb 7 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 40...
Страница 43: ...43 D Abb 10 Abb 11 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 43...
Страница 58: ...D 58 Abb 49 Abb 50 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 58...
Страница 69: ...F 69 Fig 4 Fig 5 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 69...
Страница 70: ...F 70 Fig 6 Fig 7 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 70...
Страница 73: ...F 73 Fig 10 Fig 11 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 73...
Страница 89: ...F 89 Fig 49 Fig 50 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 89...
Страница 92: ...F 92 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 92...
Страница 94: ...F 94 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 94...
Страница 95: ...F 95 TH 124 02 ITF 2407 9422 01 07 15 01 2007 15 37 Pagina 95...