Pre Start Inspection and Operation
3.15
When transporting the machine, make sure to use DOT approved chains and binders
(Item 1,
Figure 3–14
) to secure the machine to the “D” rings (Item 2,
Figure 3–14
) on
the trailer. NOTICE: It is recommended to secure the machine through the ring on the
front of the machine (Item 2,
Figure 3–14
) and through the two rings on the Operator’s
Platform (Item 4,
Figure 3–14
).
Figure 3-14Travel Chains and Binders
Lifting Procedures
When it becomes necessary to lift the machine
1. Use a lifting device that can safely lift 4,000 lbs (1820 Kg).
2. Use appropriate lifting chains (Item 1,
Figure 3–15
) that can safely lift 4,000 lbs (1820
Kg).
3. Route the chains through the lifting eye (Item 2,
Figure 3–15
) located directly below the
operating controls.
•
Lift the machine approximately 12” to make sure that the machine is balanced
before completing the lift.
• If lifting the machine with an attachment installed, the overall machine may not
be balanced from front to back.
WARNING
3
4
2
1
3
CAUTION