
13
5. Machine fixing
5.6
Adhesive plugs /shear connector
Work sequences:
Install machine at the intended location.
Use the holes of the channel lines of the trough as drilling template.
Pilot-drill with stone drill 14 mm (1/2 inch).
Remove machine or channel lines of the trough.
Bore holes:
Bore diameter and depth according to the information of the
plug producer and blow dustfree.
Additional working steps can be taken from the manuals of the producers.
Pay attention to the hardening time.
Put machine respectively channel lines of the trough on and level. If the floor is uneven,
level with wedges and fill spaces with epoxy resin.
Tight nuts evenly.