EXTERNAL POST TOPS (STANDARD)

Depending on which join you have, whether its a closed join or a exposed join your bracket height will be different in 

height.

Example: for an 1800mm high closed join wall the bracket should be fixed at 1830mm from the top of the post. This 

allows for the post top to sleeve over the post after the panels have been installed. Please Note: if you choose to have 

the exposed join you will have to add 13mm to get the required bracket height. (See table below).

FLUSH POST TOPS

The support bracket should be fixed at 5mm more than the finished wall height. 
Example: for an 1800mm high standard join wall the bracket should be fixed at 1805mm from the top of the post, if it 

is a exposed join wall the bracket should be fixed at  1819mm. This 5mm is to allow for the thickness of the top wall 

capping and base channel on top of the panel measurements.

STEP 3 – 

FIXING THE BASE BRACKETS TO THE POST

WALL SUPPORT BRACKET FIXING HEIGHTS HEIGHTS

!

IMPORTANT

Attach the panel support bracket into the post with the hex head screws supplied.

The measurement from the top of the post will vary depending if you have Flush or External (standard).

NOTE:

 

If your wall is stepped please see 

Instructions on how to Step Your Wall 

on page 17 before fixing your brackets.

Finished Wall Heights

900mm

1200mm

1500mm

1800mm

2100mm

Standard Join

930mm

1230mm

1530mm

1830mm

2130mm

Exposed Join*

N/A

N/A

1543mm*

1843mm*

2143mm*

Flush Capping*

If you have a wall with Flush Capping, take 25mm off the above 

heighhts

Suggested cleat height for your new wall

We recommend to go for the expossed 

join look as it gives a far superior 

finish to the complete wall.

SUPPORT BRACKET

TEK SCREW

POST 

INSTALLATION

Содержание ELITEWALL DuraPanel

Страница 1: ...STEP BY STEP GUIDE INSTALL GUIDE ELITEWALLTM A STEP BY STEP GUIDE TO INSTALLING YOUR FENCE...

Страница 2: ...r fence BEFOREYOU START READTHIS TOOLS LIST It is recommended that the reader pays particular attention to those items identified as IMPORTANT in this manual to ensure satisfactory long term performan...

Страница 3: ...LIST MID POST 90 POST 45 POST END POST EXTERNAL PANEL CAPPING WALL MOUNT CHANNEL MASONRY ANCHOR EXTERNAL POST T TOP CAPPING CHANNEL SUPPORT BRACKET END POST INFILL END POST WITH POST INFILL WALL PANEL...

Страница 4: ...h a circular saw if necessary to fit in within an exact measurement panel cutting procedure is detailed later in this guide Postholes can be dug by hand or with a mechanical auger Use the Footing dept...

Страница 5: ...th Classic 50mm Post hole centres Signature 70mm Post hole centres Estate 70mm Post hole centres 2400mm 2530mm 2630mm 2670mm 2700mm 2830mm 2930mm 2970mm 3000mm N A 3230mm 3270mm Wall Height Hole Depth...

Страница 6: ...n coating This will then cover the 10 years warranty otherwise Boundaryline accepts no responsibilty for any corrosion No posts should be set in actual salt water STEP 2 SCREW POSTS TOGETHER Place the...

Страница 7: ...the bracket should be fixed at 1819mm This 5mm is to allow for the thickness of the top wall capping and base channel on top of the panel measurements STEP 3 FIXING THE BASE BRACKETS TO THE POST WALL...

Страница 8: ...ow a small gap a few mm is fine between the post and string line STEP 5 SPACING YOUR POST CORRECTLY We recommend you cut a suitable spacer timber or steel to press against the back of the post rebate...

Страница 9: ...NEL CLOSED JOIN OR EXPOSED JOIN The idea of a exposed join is for a shadow line when the sun is directly above the wall the shadow will be cast into the exposed join but with the closed join the shado...

Страница 10: ...feel it is too tight to insert you can remove the top tek screw which will allow the post to expand more readily Be sure to re install the tek screw prior to inserting the top panel Insert the Alumini...

Страница 11: ...t length for your cap and then cut to suit gap Apply liquid nails fast grab or similar every 250mm NOTE The adhesive must be water based or it will melt into the polystyrene Ease the wall capping over...

Страница 12: ...t to hold the top level until the liquid nails dries FLUSH POST TOP Apply a small amount of sealant or liquid nails to the sides of the flush post top before pushing it into place wipe away any excess...

Страница 13: ...wall panels but will reduce your wall height at one end METHOD 3 Raking cutting the base maintaining a minimum 1800mm wall height at one end and a taller wall height at the low end of the slope NOTE T...

Страница 14: ...ght at the high side of the slope will be reduced by the amount of the rake in this situation 100mm Cut panel to suit the slope of the ground Support bracket height Normal placement for a 1800mm wall...

Страница 15: ...100mm Depending on the additional height gained by doing this you may require deeper footings and longer posts Please contact us for specific advice before installation ADDITIONALINFORMATION IMPORTAN...

Страница 16: ...100mm can be used but you will find it difficult to get the blade depth required when cutting through the rebate in the post that accepts the panel Note All cut edges that will remain exposed to the...

Страница 17: ...le NZDD1268 pdf or http www duspec co nz duspec file NZDD0789 pdf EXTERIORPAINTAPPLICATION IMPORTANT The metal surfaces to be painted mus be clean dry and free of contaminants Lightly scuff rub dwon a...

Страница 18: ...e clean dry and free of contaminants This can be achieved by means of a brush down with a stiff brush or rubbing lightly with a Scotch Bright pad BASE COAT We use and recommend Dulux Acra Sand texture...

Страница 19: ...0800 003 006 boundaryline co nz...

Отзывы: