![Boundaryline ELITEWALL DuraPanel Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/boundaryline/elitewall-durapanel/elitewall-durapanel_manual-to-installing_2796664015.webp)
15
STEP-BY-STEP
GUIDE
0800 003 006
/
boundaryline.co.nz
STEPPING METHOD 3 –
RAKE/CUT YOUR BOTTOM PANEL TO THE SLOPE USING
2100MM WORTH OF WALL PANELS TO MAINTAIN A MINIMUM 1800MM WALL
HEIGHT
You will maintain a maximum height of 1800mm wall height – As pictured below it should be noted that your wall height
at the high side of the slope will be increased by the amount of the rake – in this situation 100mm.
Depending on the additional height gained by doing this you may require deeper footings and longer
posts. Please contact us for specific advice before installation.
ADDITIONAL
INFORMATION
!
IMPORTANT
Cut panel to suit the slope of the ground
Support bracket height = Normal
placement for a 1800mm wall +
the amount of the rake on both
sides of the post
Insert end post infill here
Insert end post infill here
Example of a 100mm fall over this distance
1900
100
1800
100
Cut
900
1200
1000
Cutting of a panel to suit a 100m rake/slope.
NOTE:
-
On a large rake/slope a longer base channel maybe required.