Page 25-34
Version 1.7
23 June 2015
25.14.
Checking pivot / steel cable
Steps
To check the pivot and steel cable, follow the
steps in
STEP ACTION
1.
Check the attachtool head with the robot arm.
Head is fully aligned (1) (see
) with the robot
arm.
Figure 25-34 Head aligned with robot arm
2.
Flap the head fully leftwards, using teach pendant.
Flaps the head leftwards or rightwards.
3.
Bolts are stainless steel.
NOTE
: if the bolt is not stainless steel, it should be replaced
by a stainless steel one.
4.
Figure 25-35 Bolts pivot
1
1
Содержание MR-D1
Страница 1: ...Service Manual Original Service Manual Version 1 7 23 June 2015...
Страница 8: ......
Страница 10: ......
Страница 29: ...General information Safety 23 June 2015 Version 1 7 Page 2 17 Figure 2 21 Safety symbol on boiler 1...
Страница 30: ......
Страница 50: ......
Страница 74: ......
Страница 102: ......
Страница 126: ......
Страница 140: ......
Страница 142: ......
Страница 170: ......
Страница 182: ......
Страница 192: ......
Страница 206: ......
Страница 224: ......
Страница 312: ......
Страница 342: ......
Страница 416: ......
Страница 418: ...Appendices Appendix A Numbers in viewers Page 26 2 Version 1 7 23 June 2015 Figure 26 3 Vacuum Viewer...
Страница 431: ...Appendices Appendix B Wearing parts 23 June 2015 Version 1 7 Page 27 9 Figure 27 26 Gasket milk pump FP4600 030300201A...
Страница 436: ......