background image

Boschetti Industrie Meccaniche srl

 

8

 

IT

  

Ver. 01/2019

 

Thermo return 

 

 

 

 

Thermo flow 

 

 

 

 

Thermo connection (only for versions with this option)  

Only for these models: BGMTAX 80 - BGMTAX 80 GPL - BGMTAX 100 - BGMTAX 100 GPL 

The Termo version water heaters are equipped with a fixed double-walled heat exchanger and can be powered by 
alternative thermal sources through the connection to the domestic heating system or other alternative energy 
production system. For this purpose, thermo flow and thermo return have to be connected (see following draw).  

Connection’s dimensions (see technical data scheme) must be strictly respected. 

 Maximum operating pressure of the heating fluid Thermo: 3 bar.  

 

Picture 5 

Connection to the domestic heating system or other 

alternative energy production system.

 

 

 

Содержание BGMAX 100

Страница 1: ...Manual for installation and use FOR USER AND INSTALLER WALL HANG MULTIGAS STORAGE WATER HEATER Low Nox IT Cat II2H3P Prod ID Nr 0085CT0381 BGMAX 50 80 100...

Страница 2: ...Pilot s injector replacement 13 Application removal of the mask for burner tube 13 Safety gas valve setting 14 Maintenance 15 Cleaning of the evacuation system of combustion gases 15 Smokes sensor re...

Страница 3: ...ure inlet is summarized on the plate serial number placed on the frontal side of the devices on the left over the drive handle Dimensions Capacity Connections Model Weight kg Height mm Diam mm Litres...

Страница 4: ...11BS B11BS Consumption LPG G31 Hi 12 87 kWh kg kg h 0 31 0 39 0 39 Natural Gas H G20 Hi 9 45 kWh m m h 0 44 0 53 0 53 Injectors in 1 100 mm LPG Pilot 25 1 25 1 25 1 Burner 095 110 110 Pressure injecto...

Страница 5: ...The place for the installation must respect all the condition listed in the laws in force about gas plants for domestic use supplied by a distributing net Projecting installation and maintenance A co...

Страница 6: ...s settle in the current laws Before connection you have to check if the gas available in the place corresponds to the type fixed in the device see plat serial number If the gas type is different you h...

Страница 7: ...e of the product The connection for water exit is placed on the opposite side of cold water entry The water connection must be carried out with pipes a suitable for drinking water conduction Note use...

Страница 8: ...xchanger and can be powered by alternative thermal sources through the connection to the domestic heating system or other alternative energy production system For this purpose thermo flow and thermo r...

Страница 9: ...re tube must have a diameter according to the technical data schemes The laws in force on the matter must be followed The smokes sensor is a thermostat with a fixed setting If the draftdamper overheat...

Страница 10: ...cold water discharge cock open the warm water exit cock We suggest to open a warm water tap of the domestic system so that air in pipe evacuates The necessary time for the filling is strictly connect...

Страница 11: ...simulation must be carried out by inserting a pipe 50 cm long of a suitable diameter which must be plugged with a sheet metal The burner and the pilot must go out in two minutes from the moment in whi...

Страница 12: ...device must be subjected to a functions examination and you have to update the supplementary plat according to the transformation which has been carried out Burner s injector replacement This operatio...

Страница 13: ...s to LPG must be applied the mask for burner tube This operation must be carried out only by a qualified staff You have to follows these directions dismount the burner s cover and the burner s protect...

Страница 14: ...A Set the screw which is visible after remove the protection To transform natural gas into LPG screw clockwise for seven or eight times to transform LPG into natural gas unscrew the screw anticlockwi...

Страница 15: ...ount the screws on the new piece fix the screws To carry out the check of smokes sensor see the correspondent paragraph Safety gas valve replacement The replacement of a defected gas valve must be car...

Страница 16: ...Boschetti Industrie Meccaniche srl 16 IT Ver 01 2019 Picture 13 Exploded drawing A 1 2 3 4 5 6 7 9 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23...

Страница 17: ...G 25 1 8 Ignition electrode 9 Safety gas valve SIT model 610 AC 3 10 Switch for thermocouple 11 Thermocouple 12 Double screw 13 Dual conic for tube 10 14 Nut for dual conic 15 Cover for gas valve 16 P...

Страница 18: ...drinking and sanitary water any different use is not allowed Children must be kept away from gas devices Before turning on the device read carefully all the directions reported on this manual Do not l...

Страница 19: ...returns to the position flame Note If the burner does not light up repeat the operation again a new attempt can carried out only after 2 3 minutes Temperature setting Set the thermostat as you please...

Страница 20: ...h under 0 temperature freezes it is better to discharge the device The discharge procedure must be carried out as explained above The cold water feed and the gas feed must be closed carefully Precauti...

Страница 21: ...fficiency class B Energy efficiency wh 54 Annual fuel consumption AFC 09 GJ Adjustment of the appliance thermostat E5 Interior noise level LWA 53 dB BGMAX 50 GPL Brand name Boschetti Industrie Meccani...

Страница 22: ...iency wh 57 Annual fuel consumption AFC 08 GJ Adjustment of the appliance thermostat E5 Interior noise level LWA 53 dB BGMAX 100 GPL Brand name Boschetti Industrie Meccaniche srl Model BGMAX 100 GPL L...

Страница 23: ...is not manipulated in any part and the label is not get away from the water heater 3 the problem is not due by exercise pression higher than the max pression written on the technical label 4 any parts...

Страница 24: ...444 490636 Fax 39 0444 490496 E mail info boschettindustriemeccaniche it Internet www boschettindustriemeccaniche it The company is not liable for possible inaccuracies in these manual due to printing...

Отзывы: