Installation
Greenstar Danesmoor Utility
ErP+
and Utility System
ErP+
- 6 720 821 720 (2018/04)
23
5
Installation
5.1
Unpacking the boiler
Unpacking
It is advised that at least two or more people are involved in the transfer
of the packaged boiler from the van to the point of delivery.
1. Once the packaged boiler has been delivered, the outer carton is
removed first.
Care should be taken when releasing the straps. If a sharp implement
is used make sure the outer carton is not pierced and that the
implement is used in such a way so that it may not cause personal
injury. All sharp objects must be covered or the blade retracted after
use and put away in a safe place.
2. Lift carton up and away from the boiler.
▶ Remove the plastic bag and upper front protection cover from the
boiler and place safely aside.
▶ Two or more people are required to move the boiler. taking care not
to damage the boiler, panels or the floor.
Fig. 29 Unpacking
CAUTION:
Lifting and carrying
▶ Lift only a manageable weight, or ask for help.
▶ When lifting or putting things down, bend your
knees, keep your back straight, and feet apart.
▶ Do not lift and twist at the same time.
▶ Lift and carry object close to your body.
▶ Wear protective clothing and gloves to protect
against sharp edges.
NOTICE:
Before installation
▶ All the previous Pre-Installation sections must be
read and requirements met before starting boiler or
flue installation.
NOTICE: Heavy objects
▶ At all times the correct method for handling heavy
objects should be strictly observed.
1
2
6720809436-10.1W
o